<br />(1) TITLE AND LOCATION (City and State)
<br />Hillsboro/Deerfield Beach Restoration, Broward County, FL
<br />
<br />
<br />
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 2011
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Environmental permitting, coastal engineering, funding applications and biological monitoring for 339,151 cubic yard
<br />beach fill project. Conducting marine and coastal surveys including marine resource investigations, pipeline corridor
<br />surveys, hardbottom mapping, Acropora sp. and in-water sea turtle surveys, and year-long shorebird monitoring.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Manatee Bend Shoreline Stabilization and Kayak Launch, Miami-
<br />Dade County, FL
<br />
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design of shoreline stabilization to preserve existing, dilapidated, historical coral rock seawall and steps to access water
<br />to include new seawall landward of existing and limestone boulder riprap. Design of kayak launch within existing park
<br />setting to allow passive recreation and launch of non-motorized vessels to increase use of City Park. Environmental
<br />permitting of proposed structures through County, State, and federal environmental regulatory agencies and coordinate
<br />with City for municipal building permit.
<br />
<br />f.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Reach 8 DEIS Review, Palm Beach County, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Provided comments on the DEIS to be addressed in the Final Environmental Impact Statement (FEIS) to ensure that the
<br />final document represents a comprehensive technical assessment of the proposed Southern Palm Beach Island
<br />Comprehensive Shoreline Stabilization Project that is sufficient to facilitate efficient federal permitting of a shoreline
<br />stabilization project to mitigate the erosion in the southern end of the Town’s beach and that fully addresses all NEPA
<br />requirements. Detailed technical comments were provided, which are anticipated to be addressed in the Final
<br />Environmental Impact Statement.
<br />
<br />g.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Reach 8/South End Beach Nourishment, Palm Beach County, FL
<br />
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2014 N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Feasibility study, Equilibrium Toe of Fill Assessment, Mitigation Design, and modeling to support application
<br />processing for proposed beach nourishment project for the south end of the Town. Engineering assessment to evaluate
<br />sediment coming into project area from updrift beach renourishment and corresponding adjustment to project
<br />construction template. Further adjustments to template to accommodate requests from NGOs to secure support for
<br />project. Evaluated beach management, environmental permitting and funding options and processing environmental
<br />permits to authorize beach project.
<br />
<br />h.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Sunny Isles Beach Breakwater Investigation, Sunny Isles Beach,
<br />FL
<br />
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2016 N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Conducted an underwater investigation of submerged breakwaters located offshore of the City of Sunny Isles Beach.
<br />Provided a structural assessment to evaluate the condition of the existing breakwaters and summarized findings in an
<br />Engineering Assessment Report.
<br />
<br />i.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Sunny Isles Beach Coastal Structures Feasibility Study – Phase
<br />II, Sunny Isles Beach, FL
<br />
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2015 N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Prepared an updated summary of coastal structures feasibility, as an addendum to a Phase I Shoreline Stabilization Study
<br />to revise the recommendations based on beach management projects either completed or planned in the Tri-County area
<br />since 2009 for the City of Sunny Isles Beach.