My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Curtis & Rogers Designs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
Curtis & Rogers Designs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 10:16:58 AM
Creation date
5/18/2016 10:12:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architects Services
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Pinetree Park – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 2012 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> <br />Civil Designer, Shoreline, marine resource and hydrographic surveys along park waterfront. Feasibility and <br />preliminary design of canal and public water access structures. Construction costs totaled to $155,000. <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Setai Development – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2005 2005 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil Designer, Paving, grading, and drainage designs for a new residential condominium tower with 195 <br />units as well as hotel renovations. Design included water, fire and sanitary services as well as a drop-off <br />lane on Collins Avenue and 20th and 21st Street end improvements. Construction costs totaled to $150,000. <br />h. <br />(1) TITLE AND LOCATION (City and State) <br />Soundscape Park – Miami Beach, Florida <br /> <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 2011 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil Designer, Provided site/civil engineering services as part of the design team led by the architectural <br />firm, West 8. Coastal Systems completed the stormwater management design for the site, and processed <br />the Class II permit through the Miami-Dade County Department of Environmental Resource Management <br />(DERM). In addition, water and sanitary sewer services were designed for the site. <br />i. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />South of Fifth – Miami Beach, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil Designer, Development of four condominium buildings ($38M) on top of a garage pedestal with an on- <br />grade pool deck area and dune restoration project. Provided coastal permitting and engineering services that <br />included permits from the Florida Department of Environmental Protection (DEP) and marine turtle lighting <br />review through the Florida Fish and Wildlife Conservation Commission (FWC). Also provided Florida Building <br />Code, City Code (FBC), and Federal Emergency Management Agency (FEMA) flood compliance reviews. <br />j. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />South Pointe Park – Miami Beach, Florida <br /> <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2009 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Civil Designer, Civil design and coastal/environmental permitting of a$22.4M multi-purpose recreational park <br />area for structural, hardscape, and landscape improvements in excess of 16 acres. Activities include the <br />construction of a main park structure with offices/concession/restrooms, a storage facility for park vehicles, a <br />raised serpentine walkway, and playground facilities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.