|
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />
<br />
<br />
<br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Andres Perez, P.E. Engineering Department Head a. TOTAL b. WITH CURRENT FIRM
<br />17 16
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Coastal Systems International – Coral Gables, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL
<br />REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer – FL Bachelor of Science, Civil Engineering, Florida International University
<br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Perez has over 17 years of civil engineering experience in Florida. He has completed the planning, design and construction
<br />administration for site/civil projects including parks, streetscape, and Right-of-Way. He has also completed designs for private
<br />site developments such as hotels, condominiums, parking lots/garages, commercial properties and dry stack marinas. These
<br />projects have required the design of stormwater management systems consisting of retention areas, drainage wells, exfiltration
<br />trenches, and outfalls. These projects have also required the design of water and sanitary sewer services.
<br />His site/civil design experience in Florida includes the permitting of projects through agencies such as the Florida Department of
<br />Environmental Protection (DEP), South Florida Water Management District, and Florida Department of Transportation. He has
<br />processed stormwater management designs through these agencies to obtain Environmental Resource Permits (ERP), and he has
<br />demonstrated experience with projects adjacent to the coast and/or waterfront. These projects have required extensive
<br />coordination with diverse project teams to design projects that meet the development programming goals for both public and
<br />private sector clients, but that also meet the stringent regulatory permitting criteria to manage surface water runoff.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Beachwalk – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2006 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager, Civil/coastal engineering design and environmental permitting for the $3M 4,000 foot on grade paver
<br />walkway that connects Lummus Park north to 21st Street in the South Beach district of Miami Beach, along with
<br />associated amenities and landscaping.
<br />b.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Beachwalk II – Miami Beach, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing 2014
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager, Civil/coastal engineering design and environmental permitting for the $4M 2,300 feet on grade paver
<br />walkway that connects South Pointe Park, Marjory Stoneman Douglas Park, and Lummus Park in the South Beach
<br />district of Miami Beach.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Bluepoints Marina, Port Canaveral, Florida
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2009 2009
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marina design and environmental permitting for a 10-acre dry storage marina facility, including 940 dry slips, 10 wet
<br />slips, and 33 launching/holding slips. Hydrographic and marine resource surveys conducted. Civil engineering services
<br />also provided.
<br />
<br />d.
<br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br />Casa Del Mar Yacht Club, Boynton Beach, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2011 N/A
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Design and permitting of 4.1 acre site for 320 dry stack marina project. Design of docks, bulkheads and dredging for
<br />35 wet slips.
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />
<br />(2) YEAR COMPLETED
<br />Haulover Marine Center, North Miami Beach, Florida
<br />
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Ongoing Ongoing
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Marine and site/civil improvements for the redevelopment of a new marina facility with approximately 400 feet of
<br />bulkhead. Surveying, water and sanitary sewer design, utility coordination, and construction administration services
<br />provided. Redesigned sheet pile bulkhead with augercastpile-supported reinforced concrete forklift launching platform.
|