Laserfiche WebLink
<br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br /> <br /> <br /> <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Andres Perez, P.E. Engineering Department Head a. TOTAL b. WITH CURRENT FIRM <br />17 16 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />Coastal Systems International – Coral Gables, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL <br />REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer – FL Bachelor of Science, Civil Engineering, Florida International University <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Perez has over 17 years of civil engineering experience in Florida. He has completed the planning, design and construction <br />administration for site/civil projects including parks, streetscape, and Right-of-Way. He has also completed designs for private <br />site developments such as hotels, condominiums, parking lots/garages, commercial properties and dry stack marinas. These <br />projects have required the design of stormwater management systems consisting of retention areas, drainage wells, exfiltration <br />trenches, and outfalls. These projects have also required the design of water and sanitary sewer services. <br />His site/civil design experience in Florida includes the permitting of projects through agencies such as the Florida Department of <br />Environmental Protection (DEP), South Florida Water Management District, and Florida Department of Transportation. He has <br />processed stormwater management designs through these agencies to obtain Environmental Resource Permits (ERP), and he has <br />demonstrated experience with projects adjacent to the coast and/or waterfront. These projects have required extensive <br />coordination with diverse project teams to design projects that meet the development programming goals for both public and <br />private sector clients, but that also meet the stringent regulatory permitting criteria to manage surface water runoff. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Beachwalk – Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2006 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager, Civil/coastal engineering design and environmental permitting for the $3M 4,000 foot on grade paver <br />walkway that connects Lummus Park north to 21st Street in the South Beach district of Miami Beach, along with <br />associated amenities and landscaping. <br />b. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Beachwalk II – Miami Beach, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing 2014 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Project Manager, Civil/coastal engineering design and environmental permitting for the $4M 2,300 feet on grade paver <br />walkway that connects South Pointe Park, Marjory Stoneman Douglas Park, and Lummus Park in the South Beach <br />district of Miami Beach. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Bluepoints Marina, Port Canaveral, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2009 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Marina design and environmental permitting for a 10-acre dry storage marina facility, including 940 dry slips, 10 wet <br />slips, and 33 launching/holding slips. Hydrographic and marine resource surveys conducted. Civil engineering services <br />also provided. <br /> <br />d. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Casa Del Mar Yacht Club, Boynton Beach, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2011 N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Design and permitting of 4.1 acre site for 320 dry stack marina project. Design of docks, bulkheads and dredging for <br />35 wet slips. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) <br /> <br />(2) YEAR COMPLETED <br />Haulover Marine Center, North Miami Beach, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing Ongoing <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Marine and site/civil improvements for the redevelopment of a new marina facility with approximately 400 feet of <br />bulkhead. Surveying, water and sanitary sewer design, utility coordination, and construction administration services <br />provided. Redesigned sheet pile bulkhead with augercastpile-supported reinforced concrete forklift launching platform.