My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Curtis & Rogers Designs
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
Curtis & Rogers Designs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 10:16:58 AM
Creation date
5/18/2016 10:12:48 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architects Services
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />f. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Island Gardens Mega Yacht Harbour, Miami, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2009 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Marina design and environmental permitting for 50-slip megayacht harbor on Watson Island as part of $600M site <br />redevelopment. Hydrographic and marine resource surveys and underwater bulkhead assessments provided. Design of <br />dredging, mitigation, fixed piers, and utilities for vessels up to 450 feet long. <br />g. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Kennedy Park Shoreline Stabilization, Miami, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 N/A <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Design and environmental permitting for a shoreline stabilization and enhancement project. Conducted detailed <br />mangrove and upland vegetation and topographic surveys to determine areas in need of enhancement and placement of <br />view corridors. Improving shoreline at existing passive use park to include exotic removal, stabilizing shoreline with <br />native vegetation and properly permitted natural shoreline stabilization and creation of public view corridors through key <br />locations within densely vegetated mangrove fringe. <br />h. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />North Beach Recreational Corridor (NBRC) – Miami Beach, <br />Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2009 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager, Site/Civil engineering services include paving and grading for 6,700 LF of a $6M multi-purpose public <br />access corridor to traverse along the western edge of the beach dunes between 64th Street and 79th Street. Design <br />includes dune enhancements, landscaping, electrical and water service for irrigation. <br />i. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Pinetree Park – Miami Beach, Florida <br /> <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2012 2012 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Manager, Shoreline, marine resource and hydrographic surveys along park waterfront. Feasibility and <br />preliminary design of canal and public water access structures. Concepts were prepared for the City to review that <br />included lagoons, mangrove planters and kayak launching areas. Designed the kayak launching area with a unique vinyl <br />bulkhead system that incorporates an architectural fascia. <br />j. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Rickenbacker Causeway Recreational Corridor – Miami-Dade <br />County, Florida <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2011 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Senior Civil Engineer, Design of shoreline stabilization and associated public recreation area improvements along 2.5 <br />miles of shoreline of the Rickenbacker Causeway across Biscayne Bay. Marine resource and hydrographic surveys <br />completed, and coastal engineering analysis conducted to assess design wave conditions, sediment transport and <br />optimum shoreline stabilization methods. Design elements included landscaping, invasive species removal with native <br />species restoration, parking improvements, stormwater management and vendor kiosks for waterfront activities. <br />
The URL can be used to link to this page
Your browser does not support the video tag.