|
QUALIFICATIONS 5
<br />28CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-04-02
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME
<br />Todd Osborn, RA, NCARB, LEED AP
<br />13. ROLE IN THIS CONTRACT
<br />Architect
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />29
<br />b. WITH CURRENT FIRM
<br />4
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Bermello Ajamil & Partners, Inc., Fort Lauderdale, Florida
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelors of Architecture, University of Tennessee, 1986
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida Registered Architect, AR92877
<br />State of Tennessee Registered Architect, 0021953
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />NCARB Certification, LEED AP, URS Program Manager Certification Training 2005
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Public Safety Complex
<br />Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (if applicable)
<br />In Process
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Architect for the preparation of a due diligence report for the existing 60,000 SF Public Safety Facility and 10,000 SF Fire
<br />Administration building that included the assessment of the existing exterior building conditions to understand the key problems
<br />related to the exterior “skin”, finish, and fenestration waterproofing. Provided recommendations for improvements to the exterior
<br />façade and provide cost estimates for said improvements.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />City of Miami Beach Parks & Facilities Program
<br />Miami Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2007
<br />CONSTRUCTION (if applicable)
<br />Various
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Program Manager. Lead the start-up of the City’s Capital Improvement Program. Established program controls and procedures,
<br />managed Design and Construction of 18 concurrent projects. Responsibilities included management of the City’s A/E Consultant
<br />contracts, Construction Contracts, documentation of the Program Work Plan, Program Master Cost Model, and coordination
<br />of various City departments. Responsible for presentations to the City Commission and G.O. Bond Oversight Committees on
<br />behalf of the City’s CIP Department. Example projects include: Scott Rakow Recreation Center, North Shore Park and Community
<br />Center, Miami Beach Golf Club and Clubhouse, Miami Beach Regional Library and Convention Center ADA Improvements.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Pompano Beach Boulevard - Kiosk Building
<br />Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (if applicable)
<br />2012
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Architect for the transformation of an existing one story storage shed into a beach concession building located east of Atlantic
<br />Boulevard. B&A was retained by the CRA to analyze the existing structure and transform the building both functionally and
<br />aesthetically into a prime destination for beach amenities for the public. The program included restrooms and three different
<br />concession venues. All were designed into the existing footprint of the building.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Emergency Generator Services Package
<br />Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br /> 2012
<br />CONSTRUCTION (if applicable)
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm
<br />Architect for the design and construction for Emergency Generators for (5) five existing City of Pompano Beach Critical Use
<br />Facilities. Scope includes (1) one permanent Emergency Generator for (2) two existing Public Works facilities and (3) three
<br />temporary Emergency Generators for existing Community / Civic Centers in Pompano Beach.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Fire Training Tower Exterior Improvements
<br />Pompano Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (if applicable)
<br />2010
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Architect for the preparation of design, construction documents and specifications for the complete replacement of all existing
<br />door, windows and shutters for both the ground floor office / classrooms and training tower to meet current Hurricane codes.
<br />Scope included an existing conditions assessment and design of complete exterior fenestration assessment. Special attention
<br />was made for the Training Tower in insure the new design would complement the specific training exercises performed within the
<br />tower. Measures were taken to prevent water intrusion into the training tower spaces and stairwell.
<br />x
<br />x
<br />x
|