Laserfiche WebLink
QUALIFICATIONS 5 <br />28CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-04-02 <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Todd Osborn, RA, NCARB, LEED AP <br />13. ROLE IN THIS CONTRACT <br />Architect <br />14. YEARS EXPERIENCE <br />a. TOTAL <br />29 <br />b. WITH CURRENT FIRM <br />4 <br />15. FIRM NAME AND LOCATION (City and State) <br />Bermello Ajamil & Partners, Inc., Fort Lauderdale, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelors of Architecture, University of Tennessee, 1986 <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida Registered Architect, AR92877 <br />State of Tennessee Registered Architect, 0021953 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />NCARB Certification, LEED AP, URS Program Manager Certification Training 2005 <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Public Safety Complex <br />Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (if applicable) <br />In Process <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Project Architect for the preparation of a due diligence report for the existing 60,000 SF Public Safety Facility and 10,000 SF Fire <br />Administration building that included the assessment of the existing exterior building conditions to understand the key problems <br />related to the exterior “skin”, finish, and fenestration waterproofing. Provided recommendations for improvements to the exterior <br />façade and provide cost estimates for said improvements. <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />City of Miami Beach Parks & Facilities Program <br />Miami Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2007 <br />CONSTRUCTION (if applicable) <br />Various <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Program Manager. Lead the start-up of the City’s Capital Improvement Program. Established program controls and procedures, <br />managed Design and Construction of 18 concurrent projects. Responsibilities included management of the City’s A/E Consultant <br />contracts, Construction Contracts, documentation of the Program Work Plan, Program Master Cost Model, and coordination <br />of various City departments. Responsible for presentations to the City Commission and G.O. Bond Oversight Committees on <br />behalf of the City’s CIP Department. Example projects include: Scott Rakow Recreation Center, North Shore Park and Community <br />Center, Miami Beach Golf Club and Clubhouse, Miami Beach Regional Library and Convention Center ADA Improvements. <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Pompano Beach Boulevard - Kiosk Building <br />Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (if applicable) <br />2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Architect for the transformation of an existing one story storage shed into a beach concession building located east of Atlantic <br />Boulevard. B&A was retained by the CRA to analyze the existing structure and transform the building both functionally and <br />aesthetically into a prime destination for beach amenities for the public. The program included restrooms and three different <br />concession venues. All were designed into the existing footprint of the building. <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />Emergency Generator Services Package <br />Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br /> 2012 <br />CONSTRUCTION (if applicable) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE x Check if project performed with current firm <br />Architect for the design and construction for Emergency Generators for (5) five existing City of Pompano Beach Critical Use <br />Facilities. Scope includes (1) one permanent Emergency Generator for (2) two existing Public Works facilities and (3) three <br />temporary Emergency Generators for existing Community / Civic Centers in Pompano Beach. <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Fire Training Tower Exterior Improvements <br />Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (if applicable) <br />2010 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Architect for the preparation of design, construction documents and specifications for the complete replacement of all existing <br />door, windows and shutters for both the ground floor office / classrooms and training tower to meet current Hurricane codes. <br />Scope included an existing conditions assessment and design of complete exterior fenestration assessment. Special attention <br />was made for the Training Tower in insure the new design would complement the specific training exercises performed within the <br />tower. Measures were taken to prevent water intrusion into the training tower spaces and stairwell. <br />x <br />x <br />x