Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Paul Passe, PE Chief Geotechnical Engineer/Senior Support a. TOTAL b. WITH CURRENT FIRM <br />38 15 <br />15. FIRM NAME AND LOCATION (City and State) <br />Professional Service Industries, Inc. (PSI), Tampa, Florida <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Bachelor of Science, Civil Engineering, University of Wisconsin <br />- Platteville, 1978 <br />Licensed Professional Engineer: #34750, Florida; #15265, Alabama; <br />#16667, Minnesota; #21569, Wisconsin; #35971, North Carolina <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />ACI Concrete Field Testing Technician – Grade I #01277024 <br />American Society of Civil Engineers (ASCE) Member <br />National Society of Professional Engineers (NSPE) Member <br />Florida Engineering Society (FES) Member <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Fort Lauderdale Hollywood International Airport, Runway Expansion PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2012-2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Chief Engineer of the QAMT contract for the extension of Runway 10 -28. In this role, he has overseen the PDA verification and <br />analysis of the 2600+ concrete piles driven to support the tunnel and bridge structures over US 1. Dates: 05/2011-on-going <br /> <br />b. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Port of Miami Tunnel (SR A1A), Preliminary Feasibility Study, Miami-Dade <br />County, FL PROFESSIONAL SERVICES <br />CONSTRUCTION (if <br />applicable) <br />2003-2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Chief Engineer involved in the preparation of numerous Geotechnical Data Reports compiling the results of the field and lab t ests <br />associated with the geotechnical works on land and in water. Field work involved extensive permitting and coordination with v arious <br />government and environmental entities. Role: Project Engineer Dates: 2003 - 2014 Client: Mr. Steve Dusseault, P.E., P.G., PB <br />America, 305-514-3122 <br /> <br />c. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />I-95 (SR 9) Roadway Widening in Indian River County, FL (10 miles) PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2008-2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Project Engineer for geotechnical work including roadway widening, bridge widening, ponds and studies relating to noise wall. Role: <br />Project Engineer Dates: September 2008 -March 2009 Client: Mr. Terrence Walters, FDOT DMO, 954-677-7019 <br /> <br />d. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Design-Build: I-95 Roadway Widening in Brevard County, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2008-2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Chief Geotechnical Engineer for subsurface investigation, lab -testing program pile, foundation design, analysis of PDA test data and <br />issuance of pile certification documents. Project included a bridge widening over Eau Gallie Blvd. and Lake Washington Road , bridge <br />over US-17/92 (SR 500), Pineda Causeway Interchange over I -95 and Wickham Road Bridge. Role: Chief Geotechnical Engineer Dates: <br />02/08-03/09 Client: Sean Moore, PE, (813) 977 -3434 <br /> <br />e. <br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED <br />Design-Build: I-75 Roadway Widening (IROX) in Collier County, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2007-2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm <br />Chief Geotechnical Engineer reviewing the subsurface investigation, laboratory -testing program pile, foundation design, engineering <br />analysis, report preparation, and analysis of PDA test data. The work included the widening and/or replacement of 8 bridges, sound <br />walls, ponds and approximately 33 miles of roadway. Dates:03/2007 -03/2009 <br /> <br />