|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Carlos Duque Project Manager – Geotechnical Services
<br />a. TOTAL b. WITH CURRENT FIRM
<br />11 10
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Professional Service Industries, Inc., Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Bachelor Degree, Universidad EAFIT, Medellín, Colombia, 2003
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Aggregate Testing Technician – Level I, American Concrete Institute
<br />American Society of Civil Engineers (ASCE); Florida Engineering Society (FES)
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Port of Miami Tunnel (SR A1A), Miami/Miami Beach, Miami-Dade County, FL PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2003-2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm
<br />Involved in the preparation of numerous Geotechnical Data Reports which contained the results of the field and laboratory tests
<br />associated with the geotechnical works both on land and over water. The field work involved obtaining various permits (with DERM,
<br />FDEP, USACOE) and coordination with various government agencies, cruise lines and environmental entities. The field work involved
<br />the use of methodologies such as Standard Penetration Test (SPT), rock coring (wire line and conventional double/triple tube),
<br />permeability/packer testing, Cone Penetrometer Testing, grouting studies, groundwater velocity measurements etc. Due to time
<br />restrictions posed by the cruise operations, field work during the last leg of our study required a 24-hour operation over water
<br />utilizing two crews. Role: Project Specialist | Date: 2003-14 | PSI Fees: 3+ Million Dollars | Client: Mr. Steve Dusseault, P.E., P.G.,
<br />Resident Engineer, PB America, 617-821-6894.
<br />
<br />b.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />FPL Overtown-Venetian Transmission Line – Miami/Miami-Beach, Miami-
<br />Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2003-2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm
<br />Involved in developing design documents for the construction of transmission line from Miami to Miami Beach across the Biscayne
<br />Bay. The installation involved cut and cover techniques on the land side, while horizontal direction drilling (HDD) was utilized to
<br />construct the alignment across Biscayne Bay. The use of the HDD technique was vital within Biscayne Bay so as to minimize impacts
<br />to the submerged aquatic resources. The field work occurred both on land and over the shallow waters of Biscayne Bay, which
<br />required significant coordination with various environmental agencies. Role: Project Specialist | Date: 2003-08 | PSI Fees: $500k+
<br />| Client: Mr. Jim Sells, Project Manager, Jacobs, 786-236-5758.
<br />
<br />c.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />City of Opa-Locka City-Wide Water and Wastewater Improvements, Miami-
<br />Dade County, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm
<br />Due to the age of the existing infrastructure, the distribution and collection piping has experienced a significant number of failures.
<br />The city has expressed a need to put in place critical infrastructure components that are adequately and efficiently sized to handle
<br />current and projected demand whilst operating in an environmentally sound and sustainable manner. Our involvement related to
<br />determining the hydraulic conductivity values (k) to aid in the design and permitting of the proposed stormwater management
<br />system and providing recommendations for pipe bedding, groundwater control, and pavement restorations. Role: Project Specialist
<br />| Date: 2015 | PSI Fees: $72k+ | Client: Ms. Donna Grace P.E., Senior Project Manager, EAC Consulting, Inc., 954-714-2007
<br />
<br />d.
<br />(1) TITLE AND LOCATION (County) (2) YEAR COMPLETED
<br />Various Utility Line Construction in Miami-Dade County PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2014-2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ☒ Check if project performed with current firm
<br />Force Main Replacement – S.W. 192nd Avenue from S.W. 354th Street to S.W. 360th Street (2014) | S.W. 76th Street and S.W. 84th
<br />Street (2014) | N.W. 112th Avenue from W. Flagler Street to N.W. 2nd Terrace (2015) | Pump station and sewer line extension,
<br />Diplomat Parkway, Hallandale Beach, Florida (2015)
<br />
|