Laserfiche WebLink
<br /> STANDARD FORM 330 (REV. 3/2013) <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />19. RELEVANT PROJECTS <br />d. <br />(1) TITLE AND LOCATION (City and State) City of Fort Lauderdale Continuing Contract for General <br />Environmental Services, Fort Lauderdale, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2007 – 2015 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Fort Lauderdale Executive (FXE) Airport Burrowing Owl Survey: Mr. Freedman conducted burrowing owl surveys and <br />prepared migratory nest removal permit applications to facilitate construction projects at FXE. Benthic Surveys for Sylvan <br />Lake Canal and Seminole River Canal: E Sciences conducted benthic resources surveys to support dredging projects in two <br />City-maintained waterways. E Sciences’ biologists snorkeled each site to observe the presence of regulated benthic resources <br />(i.e. seagrasses, corals, etc.). E Sciences’ staff provided the City reports to accompany their permit applications. Mr. Freedman <br />managed this project. Contract Budget/Fees: $269,860 <br /> <br />e. <br />(1) TITLE AND LOCATION (City and State) City of Tampa Continuing Arborist Services Tampa, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2015-2016 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Mr. Freedman serves as an arborist and urban forestry consultant for the City of Tampa. Services have included an arborist <br />assessment of trees within the Bayshore Boulevard right-of-way proposed to be impacted by bike lane construction. Project <br />Budget/Fees: $4,990 <br /> <br />f. <br />(1) TITLE AND LOCATION (City and State) Street Tree Inventory City of Coconut Creek, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2011 – 2012 CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm E Sciences conducted a street tree inventory for the City of Coconut Creek. Work included inventorying approximately 10,000 <br />trees within the City’s communities. Mr. Freedman served as project manager for this project. Project Budget/Fees: $20,500.00 <br /> <br />g. <br />(1) TITLE AND LOCATION (City and State) Historic Vizcaya Southern Lagoon & Northern Canal Tidal Swamp Landscape Environmental Restoration Plan <br />Miami, Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2012 – 2014 CONSTRUCTION (If applicable) South Canal – 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm This project involved a multi-disciplinary landscape architecture and environmental restoration plan for the waterways and tidal <br />pool within the museum’s property, which balanced ecological function with creative landscape aesthetics, recreational functions <br />and values, and improvements to water quality, and planting designs based on historic flora inventories, including mangroves, <br />native hardwood hammock and coastal scrub species. Mr. Freedman served as the project manager for the construction <br />administration portion of this project, including evaluating contractor qualifications and conducting compliance inspections. <br />Project Budget/Fees: $123,412 <br /> <br />h. <br />(1) TITLE AND LOCATION (City and State) Pompano Beach CRA , Continuing Contract for Environmental Engineering Services, Pompano Beach, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES 2010 – Ongoing CONSTRUCTION (If applicable) N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm Martin Luther King Boulevard NEPA Review: E Sciences prepared the Type I and Programmatic Categorical Exclusion <br />Checklist and Memo for this streetscape improvement project between NW 31st Avenue and Powerline Road. This project is one <br />segment of a planned, multi-city education corridor partially funded through the FDOT LAP. The environmental review included <br />coordination with the State Historic Preservation Office regarding a potentially historic site and an inventory of community and <br />cultural resources. Mr. Freedman assisted with the field review and coordination on this project. SW 36th Avenue Pedestrian Bridge Path LAP Project Design and Permitting: In addition to the work conducted under this CRA contract, E Sciences <br />assisted with the environmental permitting for a pedestrian path project for the City. Tasks included conducting field <br />assessments of wetland and tree impacts, assisting with permit application packages and coordinating with the permitting <br />agencies and FDOT. Mr. Freedman managed and provided coordination for this project task. Contract Budget/Fees: $153,911 <br />