My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WGI
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
WGI
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:44:06 AM
Creation date
5/18/2016 11:41:52 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architect
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAND DESIGN SERVICES DIVISION <br />LANDSCAPE ARCHITECTURE // PLANNING // ENVIRONMENTAL // TRANSPORTATION // ENGINEERING // SURVEY <br />SUBSURFACE UTILITY ENGINEERING // STRUCTURES // WATER RESOURCES // CREATIVE SERVICES <br />WGI’s Land Design Services Division assisted the City <br />of Palm Beach Gardens in developing a Beautification <br />Grant Package for submittal to the Florida Department <br />of Transportations District 4. WGI performed all <br />the coordination with the FDOT District Landscape <br />Architect on behalf of the City. For the Grant Package, <br />WGI prepared conceptual landscape plans, graphic <br />renderings and conceptual landscape and irrigation <br />cost estimates. WGI also assisted the City in preparing <br />the grant write-up. <br />ALTERNATE A1A STREETSCAPE DESIGN <br />LOCATION: <br />Palm Beach Gardens, Florida <br />REFERENCE: <br />The City of Palm Beach Gardens <br />Angela Brown, Deputy Director <br />Department of Public Services/EM <br />10500 N. Military Trail <br />Palm Beach Gardens, Florida 33410 <br />Phone: 561.804.7010 <br />Email: abrown@pbgfl.com <br />DATE STARTED: <br />Design September 2015 <br />Construction September 2016 <br />DATE COMPLETED: <br />Design October 2015 <br />Construction December 2016 <br />TOTAL COST: <br />Design $2500 <br />Construction $374,000 <br />PROJECT MANAGER: <br />Jason Mihalovits, RLA, LEED AP <br />KEY STAFF: <br />Tiffany May, LEED Green Associate <br />PAGE 14
The URL can be used to link to this page
Your browser does not support the video tag.