|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12.NAME
<br />Brian Terry, RLA, LEED AP
<br />13.ROLE IN THIS CONTRACT
<br />Quality Assurance / Quality Control
<br />14. YEARS EXPERIENCE
<br />a.TOTAL
<br />16
<br />b.WITH CURRENT FIRM
<br /> 1
<br />15.FIRM NAME AND LOCATION (City and State)
<br />Wantman Group, Inc., West Palm Beach, Florida
<br />16.EDUCATION (DEGREE AND SPECIALIZATION)
<br />Bachelor of Science, Landscape Architecture, University of
<br />Kentucky
<br />
<br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Florida, Registered Landscape Architect
<br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />LEED AP Urban Land Institute
<br />Brian's experience is focused on master planning and landscape architecture. He is responsible for directing all aspects of
<br />planning for both small and large scale residential, commercial, institutional, and recreational developments, as well as roadway
<br />projects with FDOT. Brian coordinates to develop projects, meetings with consultants and government staff, reviews plans for
<br />submission, represents projects in public hearings, and develops project timelines.
<br /> 19. RELEVANT PROJECTS [Relevant Projects:]
<br />a.
<br />(1)TITLE AND LOCATION (City and State)
<br />University Park
<br />Boca Raton, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2015
<br />CONSTRUCTION (If Applicable)
<br />2015
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Project Manager. University Park is a 692 bed privately funded dormitory for students of Florida Atlantic University, located just
<br />off campus in Boca Raton. WGI Land Design Services division worked closely with the client and design team, providing
<br />planning, landscape architecture, environmental and transportation services to facilitate development of the site. The client had
<br />a vision to develop a modern facility filled with amenities that would attract FAU students. WGI worked with the client to fist
<br />develop the site plan and navigate through The City of Boca Raton’s site plan approval process. After finalizing the site plan,
<br />the focus was shifted to designing the outdoor amenity spaces which included a central courtyard area complete with zero entry
<br />pool, bar and grill, cabana structures, water/ fire feature, grand lawn, and pergola with hanging hammocks. Attention to detail
<br />was critical in developing the client’s vision of a cutting edge facility that would attract students. Modern materials and design
<br />themes were carried throughout the outdoor spaces to enhance the contemporary aesthetic style. The final project was the first
<br />of its kind in South Florida and WGI was proud to be a part of the design team.
<br />b.
<br />(1)TITLE AND LOCATION (City and State)
<br />City of Parkland Master Plan – The “Wedge”
<br />West Palm Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2011
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Landscape Architect and Planner. Encompassing approximately 2,600 Acres of land and 24 property owners WGI Land Design
<br />Services worked as a subconsultant to develop a Master Plan for the City of Parkland and the North Springs Improvement
<br />District. The purpose of the Master Plan was to create a vision for the future development of the City of Parkland and the
<br />multiple annexation parcels lying in the area commonly referred to as “The Wedge”. The Master Plan design promotes
<br />compatibility with the existing community, assures adequate infrastructure for all future growth and protects the health, safety,
<br />and welfare of the residents of the City of Parkland. The team developed Goals & Objectives for the Master Plan, conducted
<br />Inventory and Analysis studies of the existing conditions, conducted stakeholder interviews and public workshops to gather
<br />community input all prior to the development of the Master Plan. Once a final concept was completed recommendations for
<br />implementation were provided and an examination of the communities Level of Services (LOS) was completed.
<br />
<br />c.
<br />(1)TITLE AND LOCATION (City and State)
<br />Barkland Dog Park
<br />Parkland, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012
<br />CONSTRUCTION (If Applicable)
<br />N/A
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Landscape Architect and Planner. The City of Parkland initiated the design of Barkland, its first dog park, in the Fall of 2010.
<br />This project included the design and permitting of the 2-acre dog park. Services included landscape drawings, irrigation
<br />drawings, and equipment specifications for the site furnishings and accessories. Presentation graphics and elevation
<br />renderings for representation before Parkland’s City Council were also provided. Barkland includes two separate fenced in
<br />areas, one area for large dogs and one area for small dogs. There are two large walking trails that loop through the site to
<br />connect the park’s pavilions, benches, picnic tables, and drinking fountains. There is also plenty of room for man’s best friend to
<br />exercise on the play station equipment or run free in the open grass fields. The park opened for play in January 2012 and was
<br />immediately successful. Barkland has become a great destination place for the local community to gather and spend time with
<br />their family pets.
<br />d.
<br />(1)TITLE AND LOCATION (City and State)
<br />Continuing Care Retirement Community
<br />Boca Raton, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />Ongoing
<br />CONSTRUCTION (If Applicable)
<br />Ongoing
<br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm
<br />Landscape Architect and Planner. The Continuing Care Retirement Community is located on a 29-acre portion of the Jewish
<br />Federation of South Palm Beach County campus in Boca Raton, Florida. The site includes 45,000 square feet of administration
<br />buildings and over 670,000 square feet of independent living, assisted living and support facilities. WGI is responsible for site
<br />planning, landscape architecture, surveying, mapping and planning assistance, as well as design, permitting and construction
<br />observation of the pavement, site grading, surface water management system, potable water distribution system and
<br />wastewater collection system. Construction administration services included document management, submittal review,
<br />construction and testing observations, attendance at progress meetings, utility service coordination, reviewing record drawings,
<br />responses to requests for information, change order review and recommendation, and certifying construction completion.
<br />
<br />PAGE 27
|