Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Brian Terry, RLA, LEED AP <br />13.ROLE IN THIS CONTRACT <br />Quality Assurance / Quality Control <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />16 <br />b.WITH CURRENT FIRM <br /> 1 <br />15.FIRM NAME AND LOCATION (City and State) <br />Wantman Group, Inc., West Palm Beach, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science, Landscape Architecture, University of <br />Kentucky <br /> <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida, Registered Landscape Architect <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />LEED AP Urban Land Institute <br />Brian's experience is focused on master planning and landscape architecture. He is responsible for directing all aspects of <br />planning for both small and large scale residential, commercial, institutional, and recreational developments, as well as roadway <br />projects with FDOT. Brian coordinates to develop projects, meetings with consultants and government staff, reviews plans for <br />submission, represents projects in public hearings, and develops project timelines. <br /> 19. RELEVANT PROJECTS [Relevant Projects:] <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />University Park <br />Boca Raton, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2015 <br />CONSTRUCTION (If Applicable) <br />2015 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project Manager. University Park is a 692 bed privately funded dormitory for students of Florida Atlantic University, located just <br />off campus in Boca Raton. WGI Land Design Services division worked closely with the client and design team, providing <br />planning, landscape architecture, environmental and transportation services to facilitate development of the site. The client had <br />a vision to develop a modern facility filled with amenities that would attract FAU students. WGI worked with the client to fist <br />develop the site plan and navigate through The City of Boca Raton’s site plan approval process. After finalizing the site plan, <br />the focus was shifted to designing the outdoor amenity spaces which included a central courtyard area complete with zero entry <br />pool, bar and grill, cabana structures, water/ fire feature, grand lawn, and pergola with hanging hammocks. Attention to detail <br />was critical in developing the client’s vision of a cutting edge facility that would attract students. Modern materials and design <br />themes were carried throughout the outdoor spaces to enhance the contemporary aesthetic style. The final project was the first <br />of its kind in South Florida and WGI was proud to be a part of the design team. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />City of Parkland Master Plan – The “Wedge” <br />West Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2011 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect and Planner. Encompassing approximately 2,600 Acres of land and 24 property owners WGI Land Design <br />Services worked as a subconsultant to develop a Master Plan for the City of Parkland and the North Springs Improvement <br />District. The purpose of the Master Plan was to create a vision for the future development of the City of Parkland and the <br />multiple annexation parcels lying in the area commonly referred to as “The Wedge”. The Master Plan design promotes <br />compatibility with the existing community, assures adequate infrastructure for all future growth and protects the health, safety, <br />and welfare of the residents of the City of Parkland. The team developed Goals & Objectives for the Master Plan, conducted <br />Inventory and Analysis studies of the existing conditions, conducted stakeholder interviews and public workshops to gather <br />community input all prior to the development of the Master Plan. Once a final concept was completed recommendations for <br />implementation were provided and an examination of the communities Level of Services (LOS) was completed. <br /> <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Barkland Dog Park <br />Parkland, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect and Planner. The City of Parkland initiated the design of Barkland, its first dog park, in the Fall of 2010. <br />This project included the design and permitting of the 2-acre dog park. Services included landscape drawings, irrigation <br />drawings, and equipment specifications for the site furnishings and accessories. Presentation graphics and elevation <br />renderings for representation before Parkland’s City Council were also provided. Barkland includes two separate fenced in <br />areas, one area for large dogs and one area for small dogs. There are two large walking trails that loop through the site to <br />connect the park’s pavilions, benches, picnic tables, and drinking fountains. There is also plenty of room for man’s best friend to <br />exercise on the play station equipment or run free in the open grass fields. The park opened for play in January 2012 and was <br />immediately successful. Barkland has become a great destination place for the local community to gather and spend time with <br />their family pets. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Continuing Care Retirement Community <br />Boca Raton, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If Applicable) <br />Ongoing <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Landscape Architect and Planner. The Continuing Care Retirement Community is located on a 29-acre portion of the Jewish <br />Federation of South Palm Beach County campus in Boca Raton, Florida. The site includes 45,000 square feet of administration <br />buildings and over 670,000 square feet of independent living, assisted living and support facilities. WGI is responsible for site <br />planning, landscape architecture, surveying, mapping and planning assistance, as well as design, permitting and construction <br />observation of the pavement, site grading, surface water management system, potable water distribution system and <br />wastewater collection system. Construction administration services included document management, submittal review, <br />construction and testing observations, attendance at progress meetings, utility service coordination, reviewing record drawings, <br />responses to requests for information, change order review and recommendation, and certifying construction completion. <br /> <br />PAGE 27