Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Angela Biagi, RLA, LEED AP BD+C <br />13.ROLE IN THIS CONTRACT <br />Landscape Architecture <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />15 <br />b.WITH CURRENT FIRM <br /> 2 <br />15.FIRM NAME AND LOCATION (City and State) <br />Wantman Group, Inc., West Palm Beach, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Architecture, Landscape Architecture - University of Illinois, 2001 <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida, Registered Landscape Architect <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />LEED AP BD+C American Society of Landscape Architects <br />US Green Building Council <br />Angela has 15 years of experience in the management and design of a variety of projects throughout South Florida. Her range of <br />work includes mixed-use developments, transportation projects and residential community design. Serving as a project manager, <br />she is responsible for site and landscape design, manages projects through the local agency approval process and assists clients <br />from concept through construction to ensure their design intent is maintained. <br />. <br />19. RELEVANT PROJECTS [Relevant Projects:] <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />Williams Park <br />Miami Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 <br />CONSTRUCTION (If Applicable) <br />2010 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect. Angela was the landscape architect for the renovation of a City of Miami park facility building and for the <br />landscape and temporary irrigation design. The project achieved LEED Gold certification. <br />. <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Atlantic Blvd. Downtown Redevelopment <br />Pompano Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br />2013 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Landscape Architect. Angela provided landscape design for one of the Pompano Beach CRA’s key projects. This CRA project <br />centered on redevelopment of one of the City’s major pedestrian and vehicular corridors leading to Pompano Beach. <br />Improvements included streetscape improvements, enhanced pedestrian connections and business frontage improvements. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Military Trail from Toney Penna to Indiantown Road <br />Jupiter, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2012 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect. Angela prepared roadway landscape design for the Military Trail median from Toney Penna to Indiantown <br />Road. Tasks included conducting the site analysis, landscape and hardscape design, and irrigation design coordination. She <br />also assisted with the permitting of the landscape and irrigation through Palm Beach County. <br /> <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Renaissance Commons <br />Palm Beach County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2009 <br />CONSTRUCTION (If Applicable) <br />2009 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />Landscape Architect. This project converted a former corporate parking lot into a mixed use development with <br />retail/office/restaurant alongside residential loft condominiums and townhomes. Angela was responsible for landscape design <br />for the entire site which included streetscape design, lake littoral planting, residential unit landscape and pool and recreation <br />amenity design. <br />e. <br />(1)TITLE AND LOCATION (City and State) <br />SR 710 Big John Monahan Bridge Replacement Design-Build, <br />Martin County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2014 <br />CONSTRUCTION (If Applicable) <br />2014 <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Landscape Architect. Angela assisted with landscape, hardscape and irrigation design for this Design-Build project that involved <br />upgrading a two-mile section of SR 710, including the replacement of the Big John Monahan Bridge over the St. Lucie Canal in <br />Martin County. As a unique alternative, WGI was able to safeguard public funds by significantly reducing the bridge length from the <br />1,951' provided in the Concept Plans translating into a savings of nearly $10 million for the State of Florida. The John Monahan <br />Bridge DB project was the recipient of the 2014 FICE Grand Award, the DBIA Florida Project of the Year Award (Transportation), <br />DBIA Florida Best Overall Project of the Year and Engineers' Council Distinguished Engineering Project Achievement Award. <br />STANDARD FORM 330 <br />PAGE 28