My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Calvin Giordano & Assoc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-04-02) Landscape Architect Services
>
Responses
>
Calvin Giordano & Assoc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/18/2016 11:51:47 AM
Creation date
5/18/2016 11:49:15 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Landscape Architecture
Bid No. (xx-xx-xx)
16-04-02
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br />4 <br />21. TITLE AND LOCATION (City and State) <br />92ND STREET PARK <br />BAY HARBOR ISLANDS, FLORIDA <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Park Master Planning, Landscape <br />Design, Site Furnishing <br />Construction Administration <br />Permitting <br />CONSTRUCTION <br />(If applicable) <br />2010 <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />Town of Bay Harbor Islands <br />b. POINT OF CONTACT NAME <br />JC Jimenez <br />Asst. Town Manager <br />c. POINT OF CONTACT TELEPHONE <br /> NUMBER <br />(305) 866-6241 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) As a component of the Town-wide parks and open space master plan discussions moderated by CGA, an under-utilized parking lot was converted to a park space. The program for the park included an open green lawn area that could serve for multiple functions and a dedicated dog run area. Under a very tight and demanding schedule, CGA designed, permitted and provided construction administration services for the entirety of the park. At its core, the park design sought to establish an urban relationship with its surrounding walk-to context. The design provides an urban plaza that is open and accessible at all times, in addition to the multi-use field and dog areas, which are only open during daytime hours. The design was articulated to provide as much space as users can personalize with various seating options to facilitate visitors’ use of the facilities, as well as exercise equipment, doggie agility equipment, water fountains, solar-powered lighting and ample use of shade. Construction Cost $450,000, Firm’s Fee <br />$40,000 <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a. <br />(1) FIRM NAME <br />Calvin, Giordano & Associates, Inc. <br />(2) FIRM LOCATION (City and State) <br />Fort Lauderdale, FL <br />(3) ROLE <br />Prime <br />b. <br /> <br /> <br /> <br /> <br /> <br /> <br />c. <br />d. <br />AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 330 (1/2004) <br />MANDATORY USE DATE OF FORM 6/2004
The URL can be used to link to this page
Your browser does not support the video tag.