Laserfiche WebLink
City of Sunny Isles Cisco Network Install <br /> SOW#PNS0021-041816-01 P R E S I D I Ory <br /> Version 1.0 <br /> 3 Statement of Work (SOW) <br /> 3.1 Statement of Work (SOW) Overview <br /> Presidio Networked Solutions, Inc. (Presidio) is pleased to present a statement of work to <br /> provide professional services to City of Sunny Isles. <br /> This Statement of Work defines the scope of work to be accomplished by Presidio. The <br /> tasks to be performed by Presidio are defined and the responsibilities of Presidio and City <br /> of Sunny Isles are contained herein as well. <br /> Any deviations that arise during the proposed project and/or any changes to this <br /> Statement of Work will be processed through the procedure described in the "Project <br /> Change Control Procedure" (Appendix B). The investigation and the implementation of <br /> changes may result in modifications to the Estimated Schedule, Charges, or other terms <br /> of this Statement of Work. <br /> The Statement of Work includes the following sections: <br /> • Scope of Services <br /> • Key Assumptions <br /> • Technical Support after Completion <br /> • Expenses <br /> • Statement of Work Agreement <br /> • Milestone Sign-off(s) <br /> The following appendices are incorporated in and made part of this Statement of Work: <br /> • Appendix A - Deliverable Review and Acceptance Procedure <br /> • Appendix B - Project Change Control Procedure <br /> • Appendix C - Project Change Request Form <br /> 3.2 Background <br /> The City of Sunny Isles Beach has requested Presidio's assistance with the upgrade of <br /> their current Cisco UC infrastructure. In preparation for the UC upgrade and expansion, <br /> the City of Sunny Isles Beach is looking to upgrade the network infrastructure at their <br /> City Hall in Sunny Isles Beach, Florida. The City of Sunny Isles Beach has requested <br /> Presidio to provide the network design and provide templates for the network switch <br /> configuration. The City of Sunny Isles Beach will apply the configurations on the <br /> switches, perform the physical install, and migrate the current network connections to the <br /> new switching infrastructure. <br /> 5 S <br />