Laserfiche WebLink
P E I D I - SOW#P288-160406 <br /> Version 1.2 <br /> **One VM box is granted per CUWL User. Totaling 300 VM boxes <br /> A user report was pulled utilizing the Cisco LOU (License Count Utility) to validate the <br /> number of user licenses required for this upgrade. The results are below with the users <br /> that do not align with the above contract highlighted. Please note City of Sunny Isles <br /> should plan to purchase the correct licenses to true up the UC applications prior to the <br /> upgrade. <br /> SECTION 2: PROJECT PHASES <br /> The phases for this project consist of the following: <br /> • Phase 1 - Kick-off <br /> • Phase 2 - Planning (Requirements Analysis/Site Survey/Technical <br /> Design/Workshops/Etc.) <br /> • Phase 3-Deployment(Site Preparation/Hardware <br /> Implementation/Testing/Training/Etc.) <br /> • Phase 4 - Follow up (Collect Statistics/Documentation/Etc.) <br /> • Phase 5 - Closeout <br /> Phase 1 — Kick-off <br /> In order to introduce the appropriate parties from both City of Sunny Isles and Presidio <br /> on the project, a project kick-off meeting will be held. The required attendees for the kick <br /> off meeting will be Presidio's project manager, lead engineer, and City of Sunny Isles's <br /> project lead and technical representative and Account Manager (as applicable). Key <br /> client contacts and team members should be identified and in attendance. <br /> During the project kickoff meeting the content of this SOW will be reviewed to ensure <br /> that there is a clear understanding between Presidio and City of Sunny Isles as it relates <br /> to roles and responsibilities of this project. The project kickoff phase should be held in <br /> person with the client and attended by as many Presidio resources as is reasonably <br /> possible. <br /> Presidio Responsibilities for Phase 1: <br /> • Conduct a project kick off meeting <br /> • Identify key timeline objectives <br /> 6 <br /> Use or disclosure of data on this page is subject to the restriction on the title page of this proposal. • <br /> Presidio Networked Solutions,Inc.SOW Framework v8.0 <br /> SIB <br />