Laserfiche WebLink
P R E S D I O. SOW#P288-160406 <br /> Version 1.2 <br /> • City of Sunny Isles project lead and technical representative(s) <br /> Deliverables for Phase 2: <br /> • Technical requirements document (to be signed by City of Sunny Isles before <br /> Deployment starts) <br /> Phase 3— Deployment <br /> Based on information gathered during the technical workshop the Presidio lead engineer <br /> will install the equipment as much as possible offline. Once approved by City of Sunny <br /> Isles, Presidio will plug the equipment into the network and start the implementation <br /> process. Once implementation has been completed, Presidio will perform a series of <br /> system functionality tests and failover tests as identified during the technical workshop <br /> and requirements gathering. <br /> Presidio Responsibilities for Phase 3: <br /> • Conduct systems functionality testing <br /> • Conduct failover testing <br /> • Document the results of the system and failover testing <br /> City of Sunny Isles Responsibilities for Phase 3: <br /> • Participate in systems functionality testing <br /> • Participate in failover testing <br /> • Sign off on a successful test scenario(s) <br /> Required Resources for Phase 3: <br /> • Presidio lead engineer <br /> • City of Sunny Isles project lead and technical representative(s) <br /> • Other necessary resources will be identified and scheduled <br /> Deliverables for Phase 3: <br /> • System test and failover document (to be signed by City of Sunny Isles) <br /> Phase 4— Follow Up <br /> During this phase, Presidio will perform any and all agreed follow up tasks such as <br /> statistic collecting, network traces, etc. Additionally, Presidio will be responsible for <br /> documenting any equipment that has been deployed as part of this project and this <br /> 8 <br /> Use or disclosure of data on this page is subject to the restriction on the title page of this proposal. <br /> Presidio Networked Solutions,Inc.SOW Framework v8.0 <br /> SIB <br />