My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2554
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2554
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2016 3:58:12 PM
Creation date
5/31/2016 5:00:43 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2554
Date (mm/dd/yyyy)
05/19/2016
Description
Agmt w/Presidio Networked Solutions to Upgrade the City’s Phone System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> PRE I D I O._ SOW#P288-160406 <br /> Version 1.2 <br /> SOW. This also includes a high level diagram for the solution that has been <br /> implemented. All usernames, passwords, and IP addresses will be turned over to City of <br /> Sunny Isles as well. <br /> Presidio Responsibilities for Phase 4: <br /> • Develop documentation and high-level diagram of the solution that has been <br /> implemented <br /> • Turn-over all usernames, passwords, and IP addresses to City of Sunny Isles <br /> City of Sunny Isles Responsibilities for Phase 4: <br /> • Review Presidio provided documentation and provide feedback <br /> Required Resources for Phase 4: <br /> • Presidio lead engineer <br /> • City of Sunny Isles project lead and technical representative(s) <br /> Deliverables for Phase 4: <br /> • As-Build Diagrams, please include Configurations and Credentials <br /> Phase 5— Closeout <br /> Once all of the above phases have been completed, the Presidio project manager will <br /> pull together the appropriate resources from City of Sunny Isles and Presidio to conduct <br /> a closeout meeting. <br /> The purpose of this meeting is to ensure that all the tasks that have been identified in <br /> this SOW or any change orders have been completed. In addition this will provide City <br /> of Sunny Isles the opportunity to raise any open issues that need to be addressed either <br /> as part of this SOW, a change order, or a new SOW. The project closeout meeting <br /> should be held in person with as many Presidio resources in attendance as is <br /> reasonable. <br /> • <br /> Presidio Responsibilities for Phase 5: <br /> • Perform a project closeout meeting <br /> City of Sunny Isles Responsibilities for Phase 5: <br /> • Attend a project closeout meeting <br /> Required Resources for Phase 5: <br /> • Presidio lead engineer <br /> • Presidio account manager <br /> 9 <br /> Use or disclosure of data on this page is subject to the restriction on the title page of this proposal. <br /> Presidio Networked Solutions,Inc.SOW Framework v8.0 <br /> S B <br />
The URL can be used to link to this page
Your browser does not support the video tag.