Laserfiche WebLink
 City of Sunny Isles Beach, Florida  <br />Shoreline Surveying and Mapping Consulting Services  <br />  <br />  <br />  <br />CB&I Environmental & Infrastructure, Inc. RFQ No. 16‐06‐01   <br />  35 <br />10C062016D – 631216982   <br />  <br />scan sonar; magnetometer surveys; jet probes and vibracores for the Broward County 5‐mile long section  <br />(Segment II) of the shore protection project.  <br />Field Operations Manager, Beach Restoration Project, Florida, Collier County, Florida  <br />Mr. Andrews coordinated and provided field operation supervision for the phases of a comprehensive marine  <br />geotechnical and geophysical investigation in support of the Collier County restoration project. The marine  <br />investigation consisted of three distinct phases. Phase I included research and analysis and critical evaluation  <br />of historical information and data for the areas offshore Collier County. Phase II consisted of collecting  <br />offshore geotechnical data which included 50 sediment jet probes, 39 surface samples and hydrographic  <br />survey. Potential sediment deposits were identified during this phase. Phase III included more detailed  <br />geotechnical and geophysical investigations of the potential areas identified during Phase II investigations  <br />and a cultural resources investigation of the selected deposits using magnetometers and sidescan sonar. A  <br />total of 50 geotechnical vibracores, detailed seismic and sidescan data, were collected during the Phase III.