Laserfiche WebLink
<br /> <br /> <br /> <br /> <br />EDUCATION <br /> <br /> Civil Engineering, National <br />University of Nicaragua, 1983 <br />JORGE E. LACAYO <br />Project Surveyor <br /> <br />EXPERIENCE <br /> <br />Mr. Lacayo has over 27 years of experience in surveying and <br />mapping, including directing field operations, determination of <br />boundaries, right-of-way surveys and mapping, engineering design <br />surveys, route surveys for highways, topographic surveys, and <br />volume calculations. He is also an experienced Party Chief who is <br />adept at EFB/CAiCE processing for Digital Terrain Modeling, hand <br />and digital drafting, Geodetic Surveying Total Stations, and GPS. <br /> <br />PROJECTS <br /> <br />Krome Avenue South PD&E Study <br />Krome Avenue, from SW 296th Street to SW 136th Street <br />Senior Party Chief responsible for project development and <br />environment study. The general objective of this PD&E study was to <br />provide and document information necessary for the FDOT, to reach <br />a decision on the type, design, and location of improvements for the <br />Krome Avenue South PD&E Study within project limits. Setting PNCs <br />and base Line, PI and referencing. BMs. Performing Cross sections <br />Occupation location. Performing Cross sections Occupation location. <br /> <br />SR 836 Corridor <br />SR 836, from SR 821 to NW 12th Avenue <br />Senior Party Chief for a project that involved offering customers a <br />safe, comfortable, and convenient transportation choice connecting <br />to major employment areas and reducing traffic congestion. Traverse <br />and vertical control. Establishing PNCs. Closing section and block <br />corners. Occupation location. <br /> <br />I-95 Expansion <br />I-95 from NW 79th to NW 151 <br />Senior Party Chief for widening of I-95 and monitoring MSE walls at <br />ramp locations. Setting base line, performing cross sections. <br />Topographic Survey. Weekly monitoring of MSE walls. <br /> <br />US 1 Expansion <br />US1 from SW 296th Street to SW 136th Street <br />Senior Party Chief for South Miami improvement and expansion, <br />repair, and rehabilitation of roads and surrounding areas. <br />Establishing PNCs and Base Line control. BMs. Topo DTM. <br /> <br />Busway <br />US1 from SW 152nd Street to SW 88th Street <br />Senior Party Chief for the creation of a busway to provide commuters <br />with accessibility to the expanded Bus Rapid Transit expressway and <br />to alleviate the daily traffic congestion. Establishing Base Line <br />control, BMs. Running cross sections previous and after construction. <br /> <br /> <br />LOR Page 27 of 52