My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Land & Sea Surveying
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-01) Shoreline Surveying and Mapping Consulting Services
>
Responses
>
Land & Sea Surveying
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 9:49:08 AM
Creation date
6/28/2016 9:47:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17 | P a g e <br />RFQ #16-06-01 Shoreline Surveying & Mapping Consulting Services <br />Recent Project Experience: <br />Port Canaveral Channel Widening Project – Contract Administration <br />Land & Sea Surveying is working with both Dutra Group and GLF Construction on this project. Dutra was <br />awarded the dredging portion of the project and GLF was awarded the upland portion. The upland portion <br />is from the -13 foot contour up. GLF hired Dutra to perform the dredging of their portion. Land & Sea <br />Surveying is performing single beam and multi-beam surveys for both Dutra and GLF to clear dredging <br />sections. Land & Sea Surveying is also providing data for progress reports to Canaveral Port Authority and <br />the construction bond holder. <br /> <br />Sebastian Inlet Semi-Annual Survey – Contract Administration The current survey consists of surveys <br />performed with single beam, multi beam and upland RTK GPS systems. The surveys are performed in <br />February and August of every year and the performance period is 45 days. We have met the deadlines on <br />every survey and remained within the established budget. <br /> <br /> City of Fort Pierce City Marina Storm Protection – Contract Administration <br />Land & Sea Surveying worked with the City of Fort Pierce and their engineers to construct a manmade <br />breakwater in the Indian River adjacent to the marina for storm protection following near total destruction <br />of the marina in the 2004 hurricane season. Land & Sea Surveying performed a pre-design bathymetric <br />survey and the “time-zero” monitoring survey of the completed islands. We also completed a control <br />survey to set 56 brass disk benchmarks and six iron rod and caps for monitoring the shrinkage or expansion <br />of the islands. The following year, we completed the one-year monitoring survey of the islands and <br />surrounding river bottom. <br /> <br />Before Survey After Survey
The URL can be used to link to this page
Your browser does not support the video tag.