Laserfiche WebLink
PROJECT EXPERIENCE <br />RAPID STORM RESPONSE <br />Disney Vero Beach Resort Post Hurricane Shoreline Surveys, Vero Beach FL <br />ollowing multiple hurricane <br />strikes in 2004 by Hurricanes <br />Frances and Jeanne, Olin <br />Hydrographic Solutions was <br />hired to rapidly survey the <br />quantity of sand lost from the <br />dunes fronting the resort. As the <br />storms approached, OHS <br />received a last minute call to <br />document the pre- storm <br />conditions. OHS was airborne in <br />its Cessna 210 airplane en -route <br />to the jobsite within 1 hour of the <br />call due to its equipment being <br />kept in a rapid deployable state. <br />Pre- storm surveys were <br />conducted using RTK GPS and <br />standard leveling techniques due r <br />to the building sea state. An immediate post storm survey <br />and volume calculations were performed to calculate the sand <br />losses directly obtainable from the storms. Consultations with <br />the client and FEMA for potential funding were conducted and <br />beach nourishment design drawings were generated in <br />AutoCAD that maximized the amount of fill above the MHW <br />line. The firm participated in a county wide beach nourishment <br />from 2010 to 2012. <br />A V <br />www.OlinHydrographic.com <br />Consulting Engineering, Environmental, and Mapping Services <br />