Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12.NAME <br />Bryan Donahue, RLA <br />13.ROLE IN THIS CONTRACT <br />Landscape Architecture <br />14. YEARS EXPERIENCE <br />a.TOTAL <br />8 <br />b.WITH CURRENT FIRM <br /> 1 <br />15.FIRM NAME AND LOCATION (City and State) <br />Wantman Group, Inc., West Palm Beach, Florida <br />16.EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Architecture, Landscape Architecture, University of <br />Georgia <br /> <br />17.CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Florida, Registered Landscape Architect <br />18.OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />American Society of Landscape Architects <br />Bryan has over eight years of experience and oversees a team of designers on various projects, from country clubs and <br />commercial developments to residential communities and single-family residential homes. Bryan works with the client from a <br />project’s inception to fully understand their vision. He and his team then work through a detailed design process to produce final <br />landscape, hardscape, irrigation and lighting construction documents. <br />19. RELEVANT PROJECTS [Relevant Projects:] <br />a. <br />(1)TITLE AND LOCATION (City and State) <br />Society of the Four Arts <br />Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project Manager. Bryan oversaw all aspects of the project and client relationships. The Society of the Four Arts located on <br />Palm Beach Island offers a unique and quality cultural programming to the growing resort community of Palm Beach. The <br />campus is home to beautiful sculpture and botanical gardens, a library and children’s library, and a state-of-the art educational <br />facility. Each season, The Four Arts offers a dynamic lineup of cultural programing, including notable speakers, concerts, films, <br />educational programs, and art exhibitions. During the peak season there is a shortage of parking to support the patrons <br />attending the programs. WGI worked closely Conkling and Lewis Construction and the client to develop an innovative solution <br />to help alleviate the parking issues. The solution developed entailed modifications to the site to implement a stabilized sod <br />parking area on the existing green mall area in the center of the campus, utilized for valet purposes only during peak season. <br />This innovative solution alleviates the parking issues while maintaining the beauty of the existing mall space. WGI provided site <br />planning, civil engineering and landscape architecture. WGI prepared plans and provided support throughout the approval and <br />construction process. <br /> <br />b. <br />(1)TITLE AND LOCATION (City and State) <br />Abacoa Town Center <br />Jupiter, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project Manager. The Abacoa Town Center was developed approximately 15 years ago as the central commercial district to <br />support the overall Abacoa development. Over the years the Town Center has lost many of its tenants and has lost the life that <br />once filled the center. WGI was hired to develop an overall master plan and detailed concept plans for key areas throughout <br />the Town Center to help with the revitalization efforts. The overall design goal was to create a state of the art destination for <br />Abacoa communities and surrounding neighborhoods to experience local art, culture, music, fun and games in a safe, <br />educational and family friendly interactive environment which will reinvigorate life into the town center. The design process <br />began with client meetings and extensive research into successful downtown and town center developments. Ideas were <br />generated and the overall program was developed. The program was then refined into one overall master plan and several <br />detailed concept plans and renderings to convey the intent of the program and design. The final designs were incorporated into <br />an overall presentation. Now that this phase of the project is complete, the next step is developing the concepts into <br />construction documents and moving into the construction phase of the project. <br />c. <br />(1)TITLE AND LOCATION (City and State) <br />Waterway Park Continuing Services – Palm Beach County Parks <br />and Recreation <br />West Palm Beach, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Project Manager. Bryan is responsible for oversight and development of landscape plans for the project. This 30-acre park is <br />located on the west side of the Intracoastal Waterway in Jupiter. The park features include boat ramps, boardwalk and trail <br />systems, parking, picnic pavilions, and other associated facilities. Services included the master plan, development approvals, <br />environmental site assessment, upland/wetland assessment, wetland delineation, gopher tortoise survey, and a tree survey. <br />d. <br />(1)TITLE AND LOCATION (City and State) <br />Woodfield Country Club <br />Boca Raton, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />Ongoing <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3)BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE √Check if project performed with current firm <br />Landscape Architect. Bryan was responsible for preparation of all landscape architecture components associated with <br />development of this neighborhood “pocket” park. Goldenrod Park features a half-court basketball court, a play structure with a <br />rock climbing wall, multiple slides, interactive play stations and a pavilion shade structure with a picnic table. Services provided <br />to the village included preparation of landscape plans and irrigation plans. <br />STANDARD FORM 330 Page 29