Laserfiche WebLink
Landscape Architect Services RFQ No. 16-06-02 4-5 <br />Ba <br />c <br />k <br />g <br />r <br />o <br />u <br />n <br />d <br /> <br />a <br />n <br />d <br /> <br />O <br />r <br />g <br />a <br />n <br />i <br />z <br />a <br />t <br />i <br />o <br />n <br />a <br />l <br /> <br />St <br />r <br />u <br />c <br />t <br />u <br />r <br />e <br />comments. We will meet to review the documents and finalize strategy for project bidding and refine the <br />opinion of probable cost prior to issuing bid documents. <br />8. Bid and Permit Documents <br />The construction documents will be prepared for public bid, we will prepare final quantities, and make any <br />updates to the specifications package based on owner comments. The documents will be prepared for <br />building permit submittal by the awarded contractor. We will provide a written specification of the qualities <br />the awarded contractor should demonstrate in terms of project experience and financial stability. <br />9. Construction Administration <br />After awarding of the project, our Construction Engineering Inspector will be assigned to the project. The <br />construction administration process begins with a pre-construction meeting with the awarded contractor to <br />address proposed construction schedule, any permitting coordination issues, and any questions regarding <br />the permit documents. During the construction administration process CMA will respond to Contractor <br />Requests for Information, Shop Drawing Reviews, and Product Submittals. We will develop an agreed upon <br />regular site visit schedule with the city and issue site reports at each visit. We will provide a punch list at <br />substantial completion. <br />10. Project Close Out <br />After substantial completion, CMA will perform a final walk through to confirm that punch list items have <br />been completed and provide certification letters for coastal permitting, utilities, stormwater, and landscape <br />as required by the state, county, and city. At the end of the project, the Client Services manager will meet <br />with the city team to evaluate the design team’s performance on the project. <br />Technical Capabilities <br />Our landscape architecture team makes full use of the resources we have available. We have an established <br />project approach and well as internal quality control program. In addition, our staff works with the latest <br />software and cutting edge tools to make our design efforts more efficient and to leverage the visualization <br />power currently available to us. Some of the software and internal programs available to the Chen Moore team <br />are: <br />• Standard Project Approach <br />• QA/QC Program <br />• Land F/X for land planning, landscape architecture, and irrigation design <br />• AutoCAD Civil 3-D for development of construction documents <br />• Sketch-up with Maxwell Render for 3-D modeling of landscape architectural and urban design projects <br />• Adobe Photoshop, Illustrator, and In-Design for preparation of graphic documents, project manuals, and <br />design guidelines <br />• Microsoft Project for scheduling and timelines <br />• In-house GIS certified instructors and a variety of GIS software for accurate design data and cost <br />estimating <br />Graphics Software <br />Because clear graphic communication of design intent is extremely important in the practice of landscape <br />architecture, our landscape architecture department employs special software above and beyond our <br />competitors for the development of our graphic presentations. <br />Land F/X is a plug in tool developed for supplemental use with AutoCAD. The software provides our team with <br />the ability to quickly develop conceptual plan graphics, detailed planting, irrigation, hardscape, and lighting <br />plans. A benefit of the software is that materials schedules are updated automatically as design elements are <br />placed into the drawings. This provides for greater accuracy in materials square footages and line item counts. <br />It also aids in expediting the QA/QC process.