Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME <br />Gregory Mendez, P.E. <br />13. ROLE IN THIS CONTRACT <br /> Civil Engineer <br />14. YEARS EXPERIENCE <br />a. TOTAL <br /> 18 <br />b. WITH CURRENT FIRM <br /> 1 <br />15. FIRM NAME AND LOCATION (City and State) <br />Chen Moore and Associates, Miami, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Engineering / Architectural Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />FL / Professional Engineer <br /> 18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Mendez has more than 18 years of civil engineering experience in site and infrastructural development type projects for p ublic <br />and private facilities. He has extensive utilities design experience and is also very experienced with fast track projects. His <br />experience includes water, drainage and sewer designs, design reviews, managing designs and construction budgets, managing <br />field inspection staff and managing client relations. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) <br />Lincoln Road Master Plan <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Project Manager. CMA is the local subconsultant to James Corner Field Operations (JCFO), the designers of New York <br />City’s famed High Line, in the development of a Master Plan for the Lincoln Road Mall Historic District in Miami Beach. Lincoln <br />Road Mall is America’s first pedestrian mall designed in the 1960’s by Morris Lapidus. Today, Lincoln Road Mall receives an <br />average of 10,000 visitors per day and is a major tourist destination geared towards pedestrians. CMA provided local planning <br />expertise and civil engineering to support the efforts of JCFO’s development of the Master Plan. Fee $ 25,000.00 <br />b. <br />(1) TITLE AND LOCATION (City and State) <br />Miami Beach Sunset Islands 3 & 4 ROW Improvement Program <br />Miami Beach, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On going <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager Supervisor CMA is providing civil engineering and landscape architecture for the utility infrastructure and <br />roadway reconstruction of two islands (Sunset Islands 3 and 4) off the Miami Beach west coast, along the inter -coastal <br />waterway. The project was publicly bid as a design-build and funded by the City of Miami Beach. It will require coordination with <br />various agencies including the City of Miami Beach, the Miami -Dade Water and Sewer Department, the Miami-Dade Public <br />Works Department, the Miami-Dade Regulatory and Economic Resources Department and others. The project consists of the <br />replacement of 8" potable water mains, the lining of existing sanitary sewer mains, a completely new storm water drainage <br />system, including discharge pumps and outfalls, the undergrounding of all existing overhead utilities, new service connections <br />to all properties, complete roadway reconstruction and grading with new pavement section and curb, landscaping, signage and <br />striping. Cost $ 7,750,000.00 Fee $ 505,953.76 <br />c. <br />(1) TITLE AND LOCATION (City and State) <br />Halls Rd Master Pump Station & Force Main <br />Clewiston, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />On-Going <br />CONSTRUCTION (If Applicable) <br />N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager Supervisor CMA provided professional civil engineering services for the preparation of design/construction <br />documents and permitting for a new master pump station at the NW corner of Jose Billie Highway and Halls Road at the Big <br />Cypress Reservation and approximately 2,500LF of new force main tied in to the existing force main at Halls Road and the <br />entrance road to the treatment plant. The pump station is stand alone and the design scope includes all mechanical, structural, <br />electrical and civil engineering required for a fully functional station. This design also includes the connection of the exi sting <br />pump station north of Halls Road, currently serving the RV park. This new master Pump Station wil l, in the future, receive flows <br />from the West Boundary Road corridor and any remaining development along the North Josie Billie Highway corridor. The <br />design shall include accommodations in the pump station design for future build-out of the immediately surrounding areas. Fee <br />$ 99,000.00 <br />d. <br />(1) TITLE AND LOCATION (City and State) <br />East Bird Rd Corridor Sanitary Sewer Improvement <br />Miami, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2016 <br />CONSTRUCTION (If Applicable) <br />2016 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Project Manager The project intends to connect various small commercial sites on both sides of the Bird Road Corridor as well <br />as the shopping center at the NW corner of Red Road and Bird Road and nearby David Fairchild Elementary School, all of <br />which are currently served by septic systems. The project includes an initial engineering analysis phase with the preparation of <br />a technical memorandum with options and recommendations for pump strategy, small and large pump station selection, power, <br />maintenance, permitting considerations, etc. Cost $ 2,019,686.00 Fee $ 199,186.50 <br />e. <br />(1) TITLE AND LOCATION (City and State) <br />Vida at The Point <br />Aventura, FL <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2017 <br />CONSTRUCTION (If Applicable) <br />2017 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm <br />Sr. Project Manager. Vida at the Point is a luxury waterfront townhome development in Aventura. CMA provided landscape <br />architecture and civil engineering for the project. <br /> STANDARD FORM 330 (6/2004) PAGE 2 <br />