<br /> STANDARD FORM 330 (6/2004)
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />
<br />12. NAME
<br />Douglas J. Schultz, R.L.A., LEED AP
<br />13. ROLE IN THIS CONTRACT
<br />Landscape Architect / Project Manager
<br />14. YEARS EXPERIENCE
<br />a. TOTAL
<br />14
<br />b. W ITH CURRENT FIRM
<br />5
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Craven Thompson & Associates, Inc., 3563 NW 53rd Street, Fort Lauderdale, Florida 33309
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />University of Kentucky, Kentucky, USA
<br />Bachelor in Landscape Architecture (2002)
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Registered Landscape Architect
<br />Florida Registration No. LA6666937 (2006)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />- LEED Accredited Professional, United States Greenbuild Council (2009)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />(1) TITLE AND LOCATION (City and State)
<br />Oak Hammock Park (Previously called 44th Street Passive Park)
<br />Cypress Preserve Park (Previously called Oakland Park Passive Park)
<br />Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2010
<br />CONSTRUCTION (If applicable)
<br />2015
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Landscape Architect for two passive parks in the City of Sunrise. Each park has their own specific
<br />amenity that makes it unique. The hardscape components such as paving, lighting, benches, walking surfaces, fences
<br />and restroom facilities have the same character which relates the two parks together. Oak Hammock Park has a splash
<br />pad water feature for kids while the Cypress Preserve Park has a disc golf course.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)
<br />Bluesten Park
<br />Hallandale Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2016 - 2017
<br />CONSTRUCTION (If applicable)
<br />2018 - 2019
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Currently in design phase (42,000 sf Recreation Center with Pool and Splash Play Area, Soccer/Multi -use Field, three (3)
<br />baseball Fields, three (3) basketball courts, two (2) tennis courts, two (2) racquetball courts, boundless ADA inclusive
<br />playground, walking trails and pavilions; and full promenade streetscape design for surrounding streets for pedestrian
<br />friendly corridors and parallel parking. Estimated Construction Cost: $24 Million.
<br />c.
<br />(1) TITLE AND LOCATION (City and State)
<br />Dania Beach Municipal Marina
<br />Dania Beach, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Dania Beach Marina was redesigned to include a new marina, dockmaster building, public promenade along the seawall
<br />and an open air pavilion with grill and fish cleaning stations. The marina has a new configuration to maximize space and
<br />revenue. The new public promenade provides the general public access to the water’s edge and provides a connection
<br />from the marina to the new dockmaster building and open air pavilion. Mr. Schultz is the project manager responsible
<br />for the design of the site layout, public promenade and associated landscape enhancements.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)
<br />Bicycle/Pedestrian, Greenways & Trails Master Plan
<br />Sunrise, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Project Manager and Landscape Architect for the preparation of this master plan for the City of Sunrise. Together with
<br />Alta Planning and Design, the Plan will defined a system of sidewalks, bike lanes, paths, greenways and trails within the
<br />City to provide integrated and continuous corridors for non-motorized transportation and recreation throughout the
<br />City in a manner that is sensitive to the needs of various user groups, the natural and built environment, the
<br />management and maintenance, and potential funding capabilities of local government.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)
<br />Art Park
<br />Oakland Park, Florida
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES
<br />2014
<br />CONSTRUCTION (If applicable)
<br />2014
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />The City of Oakland Park asked CTA to do a plaza design for a small parcel on Dixie Highway. Project manager
<br />responsible for the design of the site and convinced the city to install an art/sculpture display park. The initial design
<br />had recycled cargo containers to serve as art gallery/pavilion spaces as well as concrete podiums for sculpture display.
<br />5 ǀ Page 4
|