My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Craven Thompson & Assoc. RFQ No. 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Craven Thompson & Assoc. RFQ No. 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:17:30 AM
Creation date
7/18/2016 11:14:42 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> STANDARD FORM 330 (6/2004) <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br /> <br />20. EXAMPLE PROJECT KEY <br /> NUMBER <br />15 <br />21. TITLE AND LOCATION (CITY AND STATE) 22. YEAR COMPLETED <br />Don Soffer Trail Improvements <br />Aventura, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 2010 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br /> <br />a. PROJECT OWNER <br />b. POINT OF CONTACT NAME <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />City of Aventura Mr. Tony Tomei <br />Capital Projects Manager <br />(954) 630-4477 <br />Email: tomeit@cityofaventura.com <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />The Don Soffer Trail Project included the design, permitting, coordination with FDOT for LAP Funding and <br />construction of improvements to upgrade the City of Aventura’s exercise path which extends along the entire length <br />of Country Club Drive, located east of Biscayne Boulevard and north of the William Lehman Causeway. The project <br />improvements included the reconstruction of the exercise path and asphalt pavement overlay; construction of <br />accessible ramps and detectable warning surfaces; grading & drainage improvements; installation of root barriers; <br />guardrail repair; landscaping; and installation of street furniture. The exercise trail is 10-feet in width and extends <br />approximately 2.85 miles. <br /> <br />TOTAL CONSTRUCTION COST WAS $452,788.00. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />a. <br />(1) FIRM NAME <br />Craven Thompson & Associates, Inc. <br /> <br />(2) FIRM LOCATION (City and State) <br />3563 NW 53rd Street <br />Fort Lauderdale, Florida 33309 <br />(3) Role <br />Prime - Landscape Architecture, Surveying, <br />Civil Engineering, and Construction <br />Management <br />b. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />c. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />d. <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION (City and State) <br /> <br />(3) Role <br /> <br />e. <br />(1) FIRM NAME <br /> <br /> <br /> <br />(2) FIRM LOCATION (City and State) (3) Role <br /> <br /> <br /> <br /> <br /> <br /> <br />5 ǀ Page 21
The URL can be used to link to this page
Your browser does not support the video tag.