Laserfiche WebLink
O’LEARY RICHARDS DESIGN ASSOCIATES, INC. 14 <br />Sunny Isles Beach RFQ No. 16-06-02          <br />Landscape Architect Services <br /> <br /> <br />Downtown Doral Park <br />Doral, Florida <br /> <br />Client name: City of Doral / The Codina Group <br /> <br />Description of the scope of work: Downtown Dor- <br />al park is a new 3 acre park located in the center of <br />the new Downtown Doral, a proposed urban center in <br />the heart of the city. The park consists of playground <br />areas, a civic court, a new open air covered pavilion, <br />and a wide variety of trees and groundcover. Fronting <br />the park to the north is the new City Hall. The design <br />of the park provides an appropriate foreground to this <br />important civic building. <br /> <br /> <br />Total Cost of projects: $650,000 <br /> <br />Project Team: Kathy O’Leary Richards, ASLA Project <br />Manager; Bill O’Leary, FASLA Sr. Landscape Architect/ <br />Quality Control; Carlos Somoza, Project Landscape <br />Architect <br /> <br />Role of firm and responsibilities: ORDA was re- <br />sponsible for the Landscape Architectural design from <br />master planning through construction administration. <br />Section 3: Minimum Requirements <br />2.4.3