My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Bermello Ajamil RFQ 16-06-02
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(16-06-02) Landscape Architect Services (Final)
>
Responses
>
Bermello Ajamil RFQ 16-06-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/18/2016 11:55:09 AM
Creation date
7/18/2016 11:50:54 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
QUALIFICATIONS 5 <br />51CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-06-02 <br />STANDARD FORM 330 (REV. 3/2013) <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />19. RELEVANT PROJECTS <br />d. <br />(1) TITLE AND LOCATION (City and State)City of Fort Lauderdale Continuing Contract for General Environmental Services, Fort Lauderdale, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES2007 –2015 CONSTRUCTION (If applicable)N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm Fort Lauderdale Executive (FXE) Airport Burrowing Owl Survey:Mr. Freedman conducted burrowing owl surveys and <br />prepared migratory nest removal permit applications to facilitate construction projects at FXE. Benthic Surveys for Sylvan <br />Lake Canal and Seminole River Canal:E Sciences conducted benthic resources surveys to support dredging projects in two <br />City-maintained waterways. E Sciences’ biologists snorkeled each site to observe the presence of regulated benthic resources <br />(i.e. seagrasses, corals, etc.). E Sciences’ staff provided the City reports to accompany their permit applications. Mr. Freedman <br />managed this project. Contract Budget/Fees: $269,860 <br />e. <br />(1) TITLE AND LOCATION (City and State)City of Tampa Continuing Arborist ServicesTampa, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES2015-2016 CONSTRUCTION (If applicable)N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm Mr. Freedman serves as an arborist and urban forestry consultant for the City of Tampa. Services have included an arborist <br />assessment of trees within the Bayshore Boulevard right-of-way proposed to be impacted by bike lane construction.Project <br />Budget/Fees: $4,990 <br />f. <br />(1) TITLE AND LOCATION (City and State)Street Tree Inventory <br />City of Coconut Creek, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES2011–2012 CONSTRUCTION (If applicable)N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm E Sciences conducted a street tree inventory for the City of Coconut Creek. Work included inventorying approximately 10,000 <br />trees within the City’s communities. Mr. Freedman served as project manager for this project. Project Budget/Fees: $20,500.00 <br />g. <br />(1) TITLE AND LOCATION (City and State)Historic Vizcaya Southern Lagoon & Northern Canal Tidal Swamp Landscape Environmental Restoration PlanMiami, Miami-Dade County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES2012 –2014 CONSTRUCTION (If applicable)South Canal –2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm This project involved a multi-disciplinary landscape architecture and environmental restoration plan for the waterways and tidal <br />pool within the museum’s property, which balanced ecological function with creative landscape aesthetics, recreational functions <br />and values, and improvements to water quality, and planting designs based on historic flora inventories, including mangroves, <br />native hardwood hammock and coastal scrub species. Mr. Freedman served as the project manager for the construction <br />administration portion of this project, including evaluating contractor qualifications and conducting compliance inspections. <br />Project Budget/Fees: $123,412 <br />h. <br />(1) TITLE AND LOCATION (City and State)Pompano Beach CRA , Continuing Contract for Environmental Engineering Services, Pompano Beach, Broward County, Florida <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES2010 –Ongoing CONSTRUCTION (If applicable)N/A <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.)AND SPECIFIC ROLE Check if project performed with current firm Martin Luther King Boulevard NEPA Review:E Sciences prepared the Type I and Programmatic Categorical Exclusion <br />Checklist and Memo for this streetscape improvement project between NW 31st Avenue and Powerline Road. This project is one <br />segment of a planned, multi-city education corridor partially funded through the FDOT LAP. The environmental review included <br />coordination with the State Historic Preservation Office regarding a potentially historic site and an inventory of community and <br />cultural resources. Mr. Freedman assisted with the field review and coordination on this project. SW 36th Avenue Pedestrian Bridge Path LAP Project Design and Permitting:In addition to the work conducted under this CRA contract,E Sciences <br />assisted with the environmental permitting for a pedestrian path project for the City. Tasks included conducting field <br />assessments of wetland and tree impacts, assisting with permit application packages and coordinating with the permitting <br />agencies and FDOT. Mr. Freedman managed and provided coordination for this project task. Contract Budget/Fees: $153,911
The URL can be used to link to this page
Your browser does not support the video tag.