Laserfiche WebLink
QUALIFICATIONS 5 <br />54CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-06-02 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS <br />CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY No. <br />3 <br />21. TITLE AND LOCATION (City and State) <br />Truman Waterfront Park <br />Key West, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2010 - 2015 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Key West <br />b. POINT OF CONTACT NAME <br />James Bouquet, PE <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-809-3962 <br />Bermello Ajamil & Partners, Inc. (B&A) was commissioned by the City of Key West to develop an overall master plan for this 23-acre <br />waterfront site adjacent to the historic Fort Zachary Taylor Park and Naval Base. Working with the City, the community, and adjacent <br />neighborhoods, B&A developed an overall plan which would attract both local residents and visitors to the waterfront. The entire <br />development of the Truman waterfront is envisioned as a water related, park-like environment where the City will enjoy revenue <br />from various commercial components to assist in the expenses of maintaining a worldclass park. The park master plan incorporates <br />a redesigned 50-foot-wide waterfront pedestrian promenade, a pedestrian bridge to span Admiral’s Cut, an open air amphitheater, <br />a renovated Navy Generator Building to be reused as a restaurant, historical museum and public restrooms, an interactive water <br />feature with two adjacent shaded playgrounds, an exercise trail with outdoor exercise stations, and a 35,000-SF recreation center <br />with an adjacent synthetic turf multi-purpose athletic and event field. B&A is presently managing construction for the first two phases <br />of the project which is expected to cost $17 million and cover approximately 80% of the site’s overall development. <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a.(1) FIRM NAME <br />Bermello Ajamil & Partners, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, Florida <br />(3) ROLE <br />Architecture, Engineering and Planning <br />b.(1) FIRM NAME <br />U.S. Cost, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, Florida <br />(3) ROLE <br />Cost Estimating <br />c.(1) FIRM NAME <br />Ken DiDonato, Inc. <br />(2) FIRM LOCATION (City and State) <br />Hollywood, Florida <br />(3) ROLE <br />Irrigation Design <br />d.(1) FIRM NAME <br />ESciences, Inc. <br />(2) FIRM LOCATION (City and State) <br />Ft. Lauderdale, Florida <br />(3) ROLE <br />Environmental Engineering <br />e.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />f.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE <br />g.(1) FIRM NAME (2) FIRM LOCATION (City and State)(3) ROLE