Laserfiche WebLink
QUALIFICATIONS 5 <br />55CITY OF SUNNY ISLES BEACH LANDSCAPE ARCHITECT SERVICES RFQ NO. 16-06-02 <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM’S QUALIFICATIONS FOR THIS <br />CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete one Section F for each project.) <br />20. EXAMPLE PROJECT KEY No. <br />4 <br />21. TITLE AND LOCATION (City and State) <br />Sullivan Park <br />Deerfield Beach, Florida <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES <br />2013 - 2015 <br />CONSTRUCTION (If applicable) <br />Ongoing <br />23. PROJECT OWNER’S INFORMATION <br />a. PROJECT OWNER <br />City of Deerfield Beach <br />b. POINT OF CONTACT NAME <br />Kris Mory <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />954.480.4317 <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />a.(1) FIRM NAME <br />Bermello Ajamil & Partners, Inc. <br />(2) FIRM LOCATION (City and State) <br />Miami, Florida <br />(3) ROLE <br />Planning, Landscape Architecture, <br />Engineering, Architecture <br />b.(1) FIRM NAME <br />Delta G Consulting Engineers, Inc. <br />(2) FIRM LOCATION (City and State) <br />Fort Lauderdale, Florida <br />(3) ROLE <br />MEP & Fire Protection <br />c.(1) FIRM NAME <br />TRC Worldwide Engineering, Inc. <br />(2) FIRM LOCATION (City and State) <br />Fort Lauderdale, Florida <br />(3) ROLE <br />Structural Engineering <br />d.(1) FIRM NAME <br />Ken DiDonato, Inc. <br />(2) FIRM LOCATION (City and State) <br />Hollywood, Florida <br />(3) ROLE <br />Irrigation Design <br />e.(1) FIRM NAME <br />ESciences, Inc. <br />(2) FIRM LOCATION (City and State) <br />Fort Lauderdale, Florida <br />(3) ROLE <br />Environmental Consultant <br />B&A was commissioned by the City of Deerfield Beach to develop alternative master plan concepts for an existing 3 acre, under <br />utilized waterfront park. Although the existing park is secluded and poorly maintained, the City intends to incorporate the park into <br />redevelopment of the waterfront and the City’s commercial core to the north. With a significant historical background, the site offers <br />an opportunity to educate the residents about the history of their community. A primary goal of the park master plan will be to <br />provide an interpretive program for visitors. The program for the revitalized park includes two playgrounds, restrooms, picnic shelters, <br />an interactive water feature, a 15 foot wide waterfront promenade and a new stair tower to connect the site to the bridge leading <br />over to the City’s beach front area. One of the primary goals for the park’s redevelopment was to increase public access to the <br />water front. This is accomplished by allowing non interrupted waterfront access and incorporating a small marina and floating docks <br />into the Master Plan. Through meetings with City staff and neighboring residents, a final concept design was selected and approved <br />by the CRA.