My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2571
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 9:34:54 AM
Creation date
8/10/2016 9:34:52 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2571
Date (mm/dd/yyyy)
07/21/2016
Description
Change Orders 8 & 9 to Agmt w/Fla Engineering re: Construct 174th St.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Florida Engineering&Development Corp tip_ <br /> 12076 NW 98th Ave. � <br /> Hialeah Gardens Fl.33018 FLORIDA ENGINEERING <br /> &DEVELOPMENT CORP. <br /> EN]INEERJHO CONTRACTOR. <br /> 1■11074 E45'.11 <br /> Project:NE 174th Street Roadway Improvements <br /> Scope of work:Removal of existing asphalt due of new curb grades,re-work Base adding on average 3"of Limerock over all surface. <br /> Contract time add: 20 days. (All of the work proposed including Chapter I, II and III) <br /> Location: NE 174th Street <br /> Date: 5/27/16 <br /> PROPOSED AMENDMENT No. 9 ASPHALT REMOVAL AND BASE RE-WORK <br /> I. WESTBOUND West of NBR Phase V and VI (North) <br /> Limits of the work: <br /> From STA 19+65 to 9+65 North side of 174(Westbound) 1000 If <br /> No. Item Qty Unit Unit Price Total <br /> A) General Conditions PHASE V AND VI <br /> 1 Laboratory and testing 1 Ls $ 1,500.00 $ 1,500.00 <br /> 2 Survey Crew 24 hrs $ 130.00 $ 3,120.00 <br /> Sub-Total General Conditions $ 4,620.00 <br /> B) MOT(item 2 Contract)PHASE V AND VI <br /> 3 Police Officer 60 Hrs $ 48.00 $ 2,880.00 <br /> 4 Barricades/Signs 2 Day $ 355.00 $ 710.00 <br /> Sub-Total MOT $ 3,590.00 <br /> C) Asphalt Removal <br /> Limits of the additional demolition: <br /> Asphalt Removal 20.5 wide x 1000 x 0.25 285 cy <br /> Labor <br /> 5 Operator 40 Hrs $ 42.26 $ 1,690.40 <br /> Equipment <br /> 6 Loader 40 Hrs $ 86.25 $ 3,450.00 <br /> 7 Truck (Asphalt hauling) 15 Load $ 190.00 $ 2,850.00 <br /> Sub-Total Asphalt Removal $ 7,990.40 <br /> D) PHASE V and VI New Asphalt and Limerock re-work <br /> 8 As needed 12"Limerock Base for Road Reconstruction 2605 sy $ 11.20 $ 29,176.00 <br /> 9 Asphalt Mobilization 1 Is $ 3,500.00 $ 3,500.00 <br /> 10 1"SP-9.5 Asphalt NBR(note:this is an increase of Item 31 of the contract 2605 sy $ 8.80 $ 22,924.00 <br /> to use on the second lift due will be 2"of new Asphalt) <br /> Sub-Total Limerock and Asphalt $ 55,600.00 <br /> Sub Total WESTBOUND West of NBR Phase V and VI(North) A,B,C,D $ i 71,800.40 I <br /> 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.