Laserfiche WebLink
Florida Engineering&Development Corp <br /> 12076 NW 98th Ave. i <br /> Hialeah Gardens Fl.33018 IFLORIDA ENGINEERING <br /> G <br /> T C <br /> &DEVELOPMENORP. <br /> EII3I7!_:NHO CCVJ 1 rv.CTCC. <br /> LirSlr.151102. E+.3.11 <br /> Project:NE 174th Street Roadway Improvements <br /> Scope of work:Removal of existing asphalt due of new curb grades,re-work Base adding on average 3"of Limerock over all surface. <br /> Contract time add: 20 days.(All of the work proposed including Chapter I, II and Ill) <br /> Location: NE 174th Street <br /> Date: 5/27/16 <br /> PROPOSED AMENDMENT No. 9 ASPHALT REMOVAL AND BASE RE-WORK <br /> II. EASTBOUND West of NBR Phase VII and VIII (South) <br /> Limits of the work: <br /> From STA 19+65 to 9+65 North side of 174(Eastbound) 1000 If <br /> No. Item Qty Unit Unit Price Total <br /> E) General Conditions PHASE V AND VI <br /> 11 Laboratory and testing 1 Ls $ 1,500.00 $ 1,500.00 <br /> 12 Survey Crew 24 hrs $ 130.00 $ 3,120.00 <br /> Sub-Total General Conditions $ 4,620.00 <br /> F) MOT(item 2 Contract)PHASE V AND VI <br /> 13 Police Officer 60 Hrs $ 48.00 $ 2,880.00 <br /> 14 Barricades/Signs 2 Day $ 355.00 $ 710.00 <br /> Sub-Total MOT $ 3,590.00 <br /> G) Asphalt Removal <br /> Limits of the additional demolition: <br /> Asphalt Removal 20.5 wide x 1000 x 0.25 285 cy <br /> Labor <br /> 15 Operator 40 Hrs $ 42.26 $ 1,690.40 <br /> Equipment <br /> 16 Loader 40 Hrs $ 86.25 $ 3,450.00 <br /> 17 Truck (Asphalt hauling) 15 Load $ 190.00 $ 2,850.00 <br /> Sub-Total Asphalt Removal $ 7,990.40 <br /> H) PHASE V and VI New Asphalt and Limerock re-work <br /> 18 As needed 12"Limerock Base for Road Reconstruction 2605 sy $ 11.20 $ 29,176.00 <br /> 19 Asphalt Mobilization 1 Is $ 3,500.00 $ 3,500.00 <br /> 20 1°SP-9.5 Asphalt NBR(note:this is an increase of Item 31 of the contract 2605 sy $ 8.80 $ 22,924.00 <br /> to use on the second lift due will be 2"of new Asphalt) <br /> Sub-Total Limerock and Asphalt $ 55,600.00 <br /> Sub Total EASTBOUND West of NBR Phase VII and VIII(North) E,F,G,H $ 71,800.40 <br /> 2 of 3 <br />