Laserfiche WebLink
Florida Engineering&Development Corp <br /> 12076 NW 98th Ave. <br /> Hialeah Gardens Fl.33018 ``e`FLORIDA ENGINEERING__. <br /> &DEVELOPMENT CORP. <br /> EN711IEERINO CCN RACTCR. <br /> I.If3' f•1311111u Ea!MI <br /> Project:NE 174th Street Roadway Improvements <br /> Scope of work:Removal of existing asphalt due of new curb grades,re-work Base adding on average 3"of Limerock over all surface. <br /> Contract time add: 20 days.(All of the work proposed including Chapter I,II and III) <br /> Location: NE 174th Street <br /> Date: 5/27/16 <br /> PROPOSED AMENDMENT No. 9 ASPHALT REMOVAL AND BASE RE-WORK <br /> III) CREDITS <br /> No. Item Qty Unit Unit Price Total <br /> Contract <br /> Items <br /> 29 1°Milling of Existing Road for NE 174st. ITEM 29 3849 SY $ 2.80 $ (10,777.20) <br /> (Note:we applied a credit of 1360 sy on amendment No.6) <br /> 3.12 NBR 11"Milling of existing 1056 SY $ 5.80 $ (6,124.80) <br /> 32 NBR-1"SP-9.5 Asphalt Overlay in Milled North Bay Road Section 1056 SY $ 8.80 $ (9,292.80) <br /> NBR-5'Wide x 6"Concrete Sidewalk Including H/C Sidewalk ramp 139 SY $ 47.50 $ (6,602.50) <br /> 45 NBR Detectable warning Surfaces 1 EA $ 340.00 $ (340.00) <br /> NBR-Reinstall/Relocate Existing Sign 1 EA $ 200.00 $ (200.00) <br /> 51 NBR Reinstall Existing Bollards 1 LS $ 1,250.00 $ (1,250.00) <br /> 83 Reinstall existing Parking Meters;Electric 1 LS $ 4,000.00 $ (4,000.00) <br /> 71 Deflection of Existing BCTV&Coordinate w/Utility 4 EA $ 9,000.00 $ (36,000.00) <br /> 72 Deflection of Existing Buried Telephone&Coordinate w/Utility 1 EA $ 24,000.00 $ (24,000.00) <br /> 73 Deflection of Existing Buried Electric(Conduit only not Duck work) 3 EA $ 1,600.00 $ (4,800.00) <br /> 84 Desilting of Existing Drainage 1 LS $ 12,500.00 $ (12,500.00) <br /> Credits Sub Total $ (115,887.30) <br /> TOTAL CHAPTER I , II and III Credits $ 27,713.50 <br /> • <br /> • <br /> Omar Medina. <br /> Project Manager <br /> Florida Engineering <br /> 3 of 3 <br />