My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2016-2571
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2016
>
Reso 2016-2571
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2016 9:34:54 AM
Creation date
8/10/2016 9:34:52 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2016-2571
Date (mm/dd/yyyy)
07/21/2016
Description
Change Orders 8 & 9 to Agmt w/Fla Engineering re: Construct 174th St.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S,) ,'-s City of Sunny Isles Beach <br /> ti <3 t 18070 Collins Avenue <br /> " Sunny Isles Beach, Florida 33160 <br /> 4,C� 1,1A-__,--01- <br /> ,F,,„ ,; (305)947-0606 City Hall <br /> *o, sv� "'- (305)949-3113 Fax <br /> MEMORANDUM <br /> TO: The Honorable Mayor and City Commission <br /> VIA: Christopher J. Russo, City Manager <br /> FROM: Elka Linton-Dorsett, Capital Projects Manager <br /> DATE: 7/21/2016 <br /> Resolution Approving Change Order 8 and 9 with Florida <br /> Engineering and Development Corporation for <br /> RE: Professional Construction Services for the 174th St <br /> Roadway Improvement Project to Widen the Proposed <br /> Sidewalks <br /> RECOMMENDATION: <br /> Staff recommends approval of this resolution. <br /> REASONS: <br /> Resolution No. 2015-2401 approved the award of ITB No. 14-11-01 to <br /> Florida Engineering and Development Corporation to provide <br /> professional construction services for the construction of the 174th St <br /> Roadway Improvement Project. The general scope of services <br /> included drainage enhancements, complete sidewalk and roadway <br /> reconstruction from N. Bay Road east, to Collins Avenue. <br /> Improvements west of N. Bay Road were limited to milling and <br /> resurfacing the existing pavement surface, and minimal sidewalk repair. <br /> New landscaping and irrigation will be installed along the full length of <br /> 174th Street. <br /> Three (3) subsequent resolutions (Reso No's 2015-2401, Reso 2015- <br /> 2473 and Reso 2016-2524) approved change orders to the scope of <br /> services, increasing the contract value by $367,028.55 to <br /> $3,579,582.28. <br /> 110 <br />
The URL can be used to link to this page
Your browser does not support the video tag.