My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 99-148
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
1999
>
Reso 99-148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:40:36 AM
Creation date
1/25/2006 1:56:24 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
99-148
Date (mm/dd/yyyy)
07/15/1999
Description
Concept: Spillis, Candela & Partners, Arch. Firm for Gov’t Ctr., $752,936.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />3054473580 SPILLIS CANDELA PTRS <br /> <br />348 P03 <br /> <br />JUL 08 '99 15:29 <br /> <br />Spillis Candela & Partners, Inc. <br /> <br />James DiPietro <br />City of Sunny Isles Beach <br />-- July 8, 1999 <br />Page 2 of 4 <br /> <br />These services and the corresponding fees will be charged as follows: <br /> <br />Master Planning (to be completed within six weeks) <br />Schematic Design (to be completed within eight weeks) <br />Design Development (to be completed within eight weeks) <br />Construction Documents (to be completed within <br />twelve weeks) <br />Bidding <br />Construction Administration (to be completed within <br />12 months) <br /> <br />Total <br /> <br />$ 31,478 <br />$ 75,294 <br />$135,528 <br /> <br />$338,821 <br />$ 26,353 <br /> <br />$145,462 <br /> <br />$752,936 <br /> <br />Civil Engineering Services required for on-site grading, drainage, utilities, drives and normal <br />assistance with permitting are included in the fee. Services related to environmental, traffic <br />issues, zoning variances, hazardous materials, off-site civil engineering or construction permits <br />are not included in this fee proposal. <br /> <br />Reimbursable expenses related to the project such as out-of-town travel, long distance <br />communications, reproductions, plotting, shipping, renderings, animations and models. These <br />expenses will be invoiced at 1.1 times the actual invoice. <br /> <br />The project schedule is a critical component of our fee quotation, The following schedule has <br />been proposed with 1 week for Owner review and approval at the end of each phase. <br /> <br />Master Planning Phase <br />Schematic Design Phase <br />Design Development Phase <br />Construction Documents Phase <br />Construction Administration Phase <br /> <br />Six weeks <br />Eight weeks <br />Eight weeks <br />Twelve weeks <br />Approx. Twelve months (Early release <br />mobilization and foundation construction <br />document package will be required on <br />February 4, 2000 in order to meet March 1, <br />2001 Certificate of Occupancy.) <br /> <br />Another critical component of our proposal relates to the number of meetings and site visits <br />during construction. Please refer to Attachment 1 A for restrictions that apply to our Scope of <br />Services. <br />
The URL can be used to link to this page
Your browser does not support the video tag.