Laserfiche WebLink
<br />Spillis Candela & Partners, Inc. <br />A IT ACHMENT 1 A <br />limitations on scope of services: <br />Sunny Isles Beach Government Center <br />July 6, 1999 <br /> <br />Meeting with Owner <br />1. Master Plan <br />a. Two meetings with Owner plus one Master Plan Final Presentation <br /> <br />2. Schematic Design Phase <br />a. Three review meetings with Owner at plus one Schematic Phase Final meeting. <br /> <br />3. Design Development Phase <br />a. Two review meetings with Owner plus one Design Development Final meeting. <br /> <br />4. Construction Document Phase <br />a. Two meeting with Owner at NE's office plus 50% and 100% Construction <br />Document Review. <br /> <br />5. Bidding <br />a. Opening of sub-contractor bids - one meeting <br /> <br />6. Construction - Construction Conference Meetings only. Refer to Meetings during <br />Construction below. <br /> <br />Meetings During Construction <br />1. Fourteen monthly construction (or Owner/Contractor) conferences <br />(Seven by Project Manager (PM); Fourteen by Project Architect (PA); one each by <br />engineer of each discipline) <br /> <br />2. Structural Eng.: <br />3. Civil Eng.: <br />4. Mechanical Eng.: <br />5. Electrical Eng.: <br /> <br />Site Visits During Construction <br />1. PM and PA: Site visits will occur during monthly construction (or Owner) <br />conferences. <br />Eight visits at four hours ea. <br />Two visits at four hours ea. <br />Twelve visits at four hours ea. <br />Ten visits at four hours ea. <br /> <br />Meetings During Construction Document Phase with Construction Manager <br />1. Two meetings at four hours each in NE's office (all SC P disciplines will participate) <br /> <br />Cost Estimate <br />Schematic Design cost estimate will be provided by NE based on building area. Other cost <br />estimates by Construction Manager. <br /> <br />Other Meetings <br />Other meetings not specifically outlined above will be charged at SCP standard billing <br />rates. <br />