Laserfiche WebLink
09/19/2001 12:08 FAX 9544331111 LUKES LANDSCAPING, INC. <br />LOU1J <br />CITY OF AVENTURA <br />This is not an order <br />BID No. 98-8- - <br />PAGE No. 19 <br />PARKS/MEDIANS/RIGHT-OF-WAY MAINTENANCE <br />SPECIFICATIONS <br />J. PUMPING STATIONS FOR COUNTRY CL S DRIVE AND AVENT RA BOULEVARD <br />1. The irrigation water is fed from the adjacent lake. Water runs from the lake to a filtration <br />tank. The filtration tank consists of 3 aluminum screens that are graduated in decreasing <br />size. (these screens are to be cleaned on a weekly basis). From the filtration well the water <br />goes to the pumping tank. <br />2. The pumping and filtration tanks will need to be monitored regularly for sediment build- <br />up. A jet -vac may be required to adequately clean sediment build-up. Failure to monitor <br />this sediment build-up will result in system failure. <br />3. The pumping station is an Aquaturf pumping station powered by twin 25 HP, vertical <br />turbine pumps that create a fully pressurized system. <br />4. All timing sequences are to be set as to not exceed a velocity of 5 feet per second. This <br />is mandatory in order to prevent excessive main -line pipe wear. <br />5. All valves, flow meters, electrical controls, micro -switches, Clayton valves, and other <br />components must be maintained on a regular basis and records must be kept on a monthly <br />basis, regarding water consumption. This information is to be supplied to the City in case <br />warranty repair work on the turbine pumps is required. In addition, and based on an <br />agreement with the South Florida Water Management District, water consumption must be <br />monitored so as to not exceed the allotted monthly usage. <br />6. Due to debris that is present in the lake water, daily inspections and/or adjustments are <br />required for the Clayton valve. Failure to do so may cause excessive line pressure and/or <br />line failure. <br />7_ Contractor must monitor water consumption from Tumberry Isle Lakes and meet, on a <br />monthly basis, with the golf course superintendent to review monthly usage and allotment. <br />8_ Contractor will be responsible to repair all main -line breaks due to ov ressurization <br />of system. <br />BIDDERS NAME: Luke Facarazzo <br />COMPANY NAME: Lukes' Landscaping, Inc. <br />