My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2001-391
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2001
>
Reso 2001-391
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2013 4:41:32 PM
Creation date
1/25/2006 1:56:57 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2001-391
Date (mm/dd/yyyy)
11/13/2001
Description
– Agmt w/Nova ConsultingPhase1/Drainage Impr Proj Central Island Area
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />NOVA CONSULTING, INC. <br /> <br />Mr, Christopher J, Russo <br />October 8, 2001 <br /> <br />Once a site is identified and approved by the City, NOVA will prepare preliminary drawings for the City's <br />review and comments. The preliminary drawings will include: <br /> <br />1. Pump station layout drawing <br />2. Drainage structures and piping layout drawing <br />3. Drainage wells and conveyance manifold drawing <br />4. Profiles and utility conflicts drawing <br /> <br />Upon approval of the preliminary drawings by the City, NOVA will proceed with detailed design of the <br />pump station relocation. This will require verification of stormwater flows and may subsequently require <br />resizing and redesign of drainage structures and piping, drainage well conveyance manifold, FPL <br />transformer, outfalls, weir elevations, and submersible pumps and appurtenances. Verification of <br />stormwaterflow rates will be performed using Streamline Technologies, Inc.'s computer model Advanced <br />Interconnected Pond Routing (AICPR), Version 2.20. <br /> <br />Also included in this task is updating the 1 00% construction drawing set previously submitted to DERM <br />and the City. The drawing set, consisting of the sheets listed below, will be revised to reflect all changes <br />resulting from the relocation of the pump station. <br /> <br />Sheet No. <br />1 <br />2 <br />3 <br />4-9 <br />10 - 15 <br />16 - 20 <br />21 <br />22-26 <br />27 - 29 <br />30 - 31 <br /> <br />Drawina No. <br />G-1 <br />G-2 <br />G-3 <br />C-1 to C-6 <br />C-7 to C-12 <br />M-1 to M5 <br />1-1 <br />S-1 to S-5 <br />E-1 to E-3 <br />MOT1 & MOT2 <br /> <br />Description <br />Cover Sheet <br />Key Plan <br />Drainage Basin Demolition <br />Proposed Drainage Improvements <br />Miscellaneous Drainage Details <br />Pump Station Yard Piping, Plan, Sections & Details <br />Pump Station Instrumentation <br />Structural Plans <br />Electrical Plans <br />Maintenance of Traffic <br /> <br />We have estimated that the survey base map developed by others will be submitted to NOVA <br />electronically (AutoCAD format). The AutoCAD format will be defined by NOVA and provided to the City <br />and surveyor prior to initiating fieldwork. <br /> <br />Task 2.0 Conceptual Environmental Resource Permit <br /> <br />Construction, alteration and operation of stormwater management systems are permitted through the <br />South Florida Water Management District (SFWMD). SFWMD issues three types of permits: <br /> <br />1. Conceptual ERP; <br />2. Construction ERP; and <br />3. Operation ERP. <br /> <br />Conceptual ERPs are issued by the SFWMD to approve drainage master plans and projects that will be <br />constructed in phases. SFWMD's intent of issuing conceptual ERPs is to ensure continuity between <br />phases and assure satisfactory completeness of individual phases relative to the overall project objective. <br />As such, a conceptual permit does not authorize construction of any individual phase. The applicant's <br /> <br />Page 2 of 4 <br />J: \ 1 02001 1 020 1 IPI 1 020 1 P002, doc /0108101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.