My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-413
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2013 3:45:18 PM
Creation date
1/25/2006 1:57:00 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-413
Date (mm/dd/yyyy)
01/17/2002
Description
– Agmt w/Spillis Candela & Part., Arch. Srvs: New City Hall, 18050 Coll.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />record pints of drawings and other documents, or if required by the Owner, the Architect- <br />Engineer shall deliver to the Owner the original tracings, but in such event the Owner at his own <br />expense shall furnish the Architect-Engineer with a set of reproducible record prints thereof. <br /> <br />ARTICLE 13 <br /> <br />SUCCESSORS AND ASSIGNS <br /> <br />The Owner and the Architect-Engineer each binds himself, his partners, successors, assigns and <br />legal representatives to the other party to this Agreement and to the partners, successors, assigns <br />and legal representatives of such other party in respect of all covenants of this Agreement. <br />Neither the Owner nor the Architect-Engineer shall assign, sublet or transfer his interest in this <br />Agreement without the written consent ofthe other. <br /> <br />ARTICLE 14 <br /> <br />CLAIMS AND DISPUTES <br /> <br />The provisions of Title 28, Florida Administrative Code, are referred to and adopted by reference <br />as though set forth herein. <br /> <br />Under the terms of this contract, the Architect-Engineer shall not have any right to compensation <br />other than, or in addition to, that provided by this contract to satisfy any claim of any kind <br />whatsoever unless the claim therefore is delivered to the Owner within ninety (90) days from the <br />date on which the act or event constituting the basis of such claim occurs. Failure to present any <br />claim arising under this contract within the ninety (90) day time period specified above shall <br />constitute waiver and abandonment of claimant's right to seek administrative consideration of <br />said claim. <br /> <br />All such claims set forth in a petition addressed to the Owner stating: <br /> <br />(1) The Architect-Engineer's name and business address; <br /> <br />(2) A concise statement of the ultimate facts, including a statement of all disputed <br />issues of material fact upon which the claim is based; <br /> <br />(3) A concise statement of the provisions of the contract, together with any federal, <br />state and local laws, ordinances or code requirements or customary practices and <br />usages in the trade or profession asserted to be applicable to the questions <br />presented by the claim; and <br /> <br />(4) A demand for that specific relief to which the Architect-Engineer deems himself <br />entitled. <br /> <br />Attny/Final.\grccmcnt Bct\vtm SIB and <br />Spillis Candela/Z/Z5/0Z /(cb) <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.