My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2002-413
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2002
>
Reso 2002-413
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2013 3:45:18 PM
Creation date
1/25/2006 1:57:00 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2002-413
Date (mm/dd/yyyy)
01/17/2002
Description
– Agmt w/Spillis Candela & Part., Arch. Srvs: New City Hall, 18050 Coll.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Within thirty (30) days from the receipt of any petition setting forth the claim, the Owner shall <br />provide the Architect-Engineer its written response stating Owner's position with respect to each <br />claim asserted <br /> <br />The venue for all civil and administrative actions against the department shall be in Miami-Dade <br />County, unless otherwise agreed by the parties. <br /> <br />ARTICLE 15 <br /> <br />PROHffiITION AGAINST CONTINGENT FEES <br /> <br />"The Architect (or registered land surveyor or professional engineer, as applicable) warrants that <br />he has not employed or retained any company or person, other than a bona fide employee <br />working solely for the architect (or registered land surveyor, or professional engineer, as <br />applicable) to solicit or secure this agreement and that he has not paid or agreed to pay any <br />person, company, corporation, individual or firm other than a bona fide employee working solely <br />for the architect (or registered land surveyor or professional engineer, as applicable) any fee, <br />commission, percentage, gift, or any other consideration contingent upon or resulting from the <br />award or making of this Agreement. For the breach or violation of this provision, the Owner <br />shall have the right to terminate this Agreement without liability and, at his discretion, to deduct <br />from the Basic Services Compensation, or otherwise recover, the full amount of such fee, <br />commission, percentage, gift, or consideration." <br /> <br />ARTICLE 16 <br /> <br />SPECIAL PROVISIONS <br /> <br />16.1 Monthly Reports: <br /> <br />(1) It shall be the responsibility of the Architect-Engineer to fully inform the Owner <br />of the progress of the Planning and Design. To this end the Architect-Engineer <br />shall furnish the Owner (Project Director and Manager of Project Development) <br />with a status report and a forecasted completion schedule at the end of each month <br />following the receipt of the signed contract document. The Architect-Engineer <br />shall furnish these reports until a contract award is made for construction at which <br />time the reports described in Section (2) below, shall be furnished. <br /> <br />(2) The Architect-Engineer shall complete a Monthly Construction Report each and <br />every month based on knowledge obtained through observation of the <br />construction work. The Architect-Engineer shall submit this report to the Owner <br />on or before the first day of each month. <br /> <br />16.2 The Architect-Engineer shall take minutes of all meetings held with the Owner and/or <br />Contractor and shall provide copies of the same to the Owner within ten (to) days <br />following such meetings. <br /> <br />.\ttny /Final .\gr~cmCl1t B~tween SIB and <br />Spillis Candela/2/25/02 /(~b) <br /> <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.