My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2003-518
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2003
>
Reso 2003-518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2015 3:49:08 PM
Creation date
1/25/2006 1:57:15 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2003-518
Date (mm/dd/yyyy)
02/20/2003
Description
– Construction Change Directive #4, Weitz Co., Pile Installation Monitor.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JC -02 -03 02;03PM FROM -CITY OF SUNNY ISLES BEACH <br />December 20, 2002 <br />+3059493113 T -009 P. 03/06 F-676 <br />%J' MACTEC <br />City of Sunny Isla Beach. <br />17070 Collins Avenue Suite 250 <br />Sunny Isles Beach, Florida 33160 <br />Attention: Mr. Jorge L. Vera <br />Subject: Proposal to Provide Production Pile Instaliation Monitoring n � S 00 <br />Tony Roma's Restaurant l <br />18050 Collins Avenue <br />Sunny Isles Beach, Florida, Florida <br />LAW Proposal No. 40799 - 0-0000 Phase <br />Dear Mr: Vera <br />Thank you for the oppormnity to provide you with this proposal for the production pile <br />installation monitoring services. We understand that a total of 120 piles approximately 30 to 40 <br />feet in depth will be installed. <br />Scope of Services <br />• Compensation <br />Authorization <br />SCOPE OF SERVICES <br />Based on our experience from ira pecting the installation of the production piles on this project <br />and on other similar projects, the following is an outline of the scope of engineering services <br />we are prepared to provide for the production pile installation: <br />1. Production Pile Installation Monitoring <br />Provide a qualified augercast inspector to: <br />• Calibrate the grout pump (it units or cubic feet per stroke). <br />• Monitor the addition of any water and/or admixtures to the grout at the site and <br />performing flow cone tests, if required <br />MACTEC Engineering and Consumng, Inc. <br />5845 NW 158th Street <br />Miami Lakes, FL 33014 <br />3054M-Na - Fax: 3oS- 826.1799 <br />www.mactec.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.