My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2003-570
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2003
>
Reso 2003-570
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 9:40:39 AM
Creation date
1/25/2006 1:57:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2003-570
Date (mm/dd/yyyy)
07/17/2003
Description
– Agmt w/Interntl Sign & Design Corp., Entrance Signage (BA03-04-01)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />. \ <br /> <br />placement, access, etc. <br /> <br />3.02 INSTALLATION OF SIGNS <br /> <br />A. General: Complete installation shall be in accordance with manufacturer's printed <br />instructions and accepted shop drawings, to produce Work: complying with the <br />Contract Documents. The CONTRACTOR will be responsible for daily clean-up <br />of their areas of Work. <br /> <br />B. Erection of Signs: Set and attach the Work accurately in locatio~ alignment and <br />elevation, plumb, level and true, as measured from established reference points <br />and from other Work already in place. Fit components accurately together to <br />from tight joints and secure connections. Coordinate with other trades as <br />necessary, if applicable. <br /> <br />3.03 ADJUSTING <br /> <br />Neatly repair minor blemishes or marring on finished surfaces so that repairs are <br />imperceptible. ,Completely replace components having permanent non-removable <br />scratches, stains, or other defacement. <br /> <br />3.04 CLEANING <br /> <br />Upon completion of the Work, remove unused materials, debris, containers and <br />equipment from the project site. Remove protective coverings and clean the exposed <br />surfaces of the work to remove dirt, stains and other substances, by methods as <br />recommended by manufacturer. <br /> <br />3.05 PROTECTION <br /> <br />Protect the Wark during the construction period so that it will be without any indication <br />of use or damage. Leave the Work clean and free from defects at time of <br />CONSULTANT'S acceptance. <br /> <br />3.06 FINAL WALK-THROUGH AND PUNCHLIST <br /> <br />A final walk-through will be held with CONSULT ANT to review the finished <br />installation. CONSUL T ANT will prepare a punchlist of all items requiring modification. <br />The CONSULT ANT reserves the right to reject all or part of the signs that do not <br />correspond to the Contract Documents and specifications or the approved shop drawings, <br />lettering patterns, samples, etc. <br /> <br />02841-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.