Laserfiche WebLink
<br />Work Authorization No, 29 <br />11120/03 <br />Calvin, Giordano & Associates, Inc. Proposal No. 03-4466 <br /> <br />CITY OF SUNNY ISLES BEACH <br />WORK AUTHORIZATION ESTIMATE 11/20/03 <br /> <br />WORK AUTHORIZATION NO. <br />PROJECT NAME <br /> <br />DESCRIPTION <br /> <br />ESTIMATED DESIGN TIME: <br />ESTIMATED CONSTRUCTION <br />TIME: <br /> <br />ASSOCIA TE, ENGINEERING <br />PROJECT MANAGER <br />PROJECT ENGINEER <br />CADD TECNICIAN <br />CLERICAL <br /> <br />Reviewed by: <br /> <br />~/4 <br /> <br />Christopher R-dSso, City Manager <br /> <br />29 <br /> <br />Collins Avenue (SR AlA) Median Closure Traffic Study <br />CGA Proposal No. 03-4466 <br /> <br />This project is a preliminary study for the closure of medians on Collins <br />Avenue (SR AlA) between 189th Street and 159th Street. <br /> <br />5 Months <br /> <br />Not Applicable <br /> <br />HOURS <br />8 <br />100 <br />229 <br />40 <br />40 <br /> <br />RATE <br />$130.00 <br />$115.00 <br />$95.00 <br />$65.00 <br />$55.00 <br /> <br />COST <br />$1,040.00 <br />$11,500.00 <br />$21,755.00 <br />$2,600.00 <br />$2,200.00 <br /> <br />LABOR SUBTOTAL <br />RE~URSABLESUBTOTAL <br />TOTAL <br /> <br />$39,095.00 <br />$3,909.50 <br />$43,004.50 <br /> <br />P:\Proposals\2003 PrqlOsals\034466 Collins Ave Median Closure Traffic Sty.doc <br /> <br />SIB <br />