My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-689
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-689
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2010 9:41:13 AM
Creation date
1/25/2006 1:57:39 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-689
Date (mm/dd/yyyy)
07/08/2004
Description
– Agmt w/Calvin Giordano re: Underground Drainage System Margolis Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />~ <br /> <br />Work Authorization No.42 <br />July 2, 2004 <br />Calvin, Giordano & Associates, Inc. Proposal.No. 04-4778 <br /> <br />E. <br /> <br />Final Civil Engineering Services <br /> <br />Prepare construction drawings . and specifications including grading and <br />drainage plans in accordance with all applicable codes. Secure ~ll necessary <br />approvals for construction of project with Miami-Dade Public Works, FDOT, <br />Miami-Dade County Environmental Resource Management District, Miami- <br />Dade County Water and Sewer Department and the City of Sunny Isles Beach. <br />Perform all work incidentals to design of layout. Provide engineering drawings <br />at time of technical compliance. During bidding phases, any Requests for <br />Information (RFI' s) shall be' responded to, bids sh,~.ll be opened, tabulated and <br />, recommendations shall be made. <br /> <br />. <br /> <br />III. Construction Phase Services <br /> <br />A. Shop Drawing review and approval. <br />B. Record Drawing review and approval. <br />C. Final Certification and Closeout. <br />D. Pay Request review and approval. <br />E. Attend the pre-bid and monthly meetings. <br /> <br />2. BASIS OF COMPENSATION: . <br /> <br />Hourly rates with an estimated fee of $52,620 plus reimbursables at $2,631 with a total not to <br />exceed amount of $55,251. Payments to be made monthly. The total not to exceed amount <br />will be'billed on a lump sum basis. <br /> <br />3. TIME OF PERFORMANCE: <br /> <br />Item I through III under the Scope of Services will be completed within 60' calendar days after <br />the Notice to Proceed exc pt for delays beyond the control of the Consultant. <br /> <br />Submitted by: <br /> <br /> <br />Date: . 7/:>./" l{ <br /> <br />.. <br /> <br />4, SUBMITTED: <br /> <br />Calvin, Giordano & Associates, Inc. <br /> <br />5. <br /> <br />APPROVAL: <br /> <br />~4 <br /> <br />Christ pher R s.so <br />City Manager <br /> <br />Date: 7(:lc IO~ <br /> <br />Approved by: <br /> <br />S1B <br /> <br />P:\ProposaIs\2004 ProposaIs\04-4778 City of Sunny Isles Beach Margolis Park Underground Drainage.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.