Laserfiche WebLink
<br />Work Authorization No. 42 <br />. . July 2, 2004 <br />~alvin, Giordano & Associates, Inc. Proposal No. 04-4778 <br /> <br />CITY OF SUNNY ISLES BEACH <br />WORK A-UTHORIZATION ESTIMATE JULY 2, 2004 <br /> <br />.... <br /> <br />~ <br /> <br />#42 <br />Margolis Park Underground Drainage <br />CGA Proposal No. 04-4778 <br /> <br />Surveying, Engineering Design and Construction Services shall be <br />performed for Margolis Park between NE 17Sth Street and North Bay <br />Road. ... . <br />2 Months <br /> <br />WORK AUTHORIZATION NO. <br />PROJECT NAME <br /> <br />DESCRIPTION <br /> <br />ESTIMATED DESIGN TIME: <br />ESTIMATED CONSTRUCTION <br />TIME: " <br />ESTIMATED CONSTRUCTION <br />COST: <br /> <br />3 Months <br /> <br />$283,50().00 <br /> <br />,. <br /> <br />TITLE RATE HOURS . COST <br />DIRECTOR, ENGINEERING $115.00 16.00 $1,840.00 <br />PROJECT MANAGER $105.00 40.00 $4,200.00 <br />PROJECT ENGINEER $95.00 160.00 $15,200.00 <br />ENGINEER CADD TECHNICIAN $65.00 144.00 $9,360.00 <br />RESIDENT INSPECTOR . $70.00 194.00 $13,580.00 <br />CLERICAL $55.00 16.00 $880.00 <br />PERMIT ADMINISTRATOR $65.00 24.00 $1,560.00 <br />REGISTERED ENGINEER/SURVEYOR $85.00 4.00 $340.00 <br />SURVEY COORDINATOR $75.00 4.00 $300.00 <br />SURVEY CADD TECHNICIAN . $65.00 16.00 $1,040.00 <br />SURVEY CREW $90.00 48.00 $4,320.00 <br /> <br />.. <br /> <br />. , <br /> <br />LABORSUBTOTATAL <br />REIMBURSABLE SUBTOTAL <br />TOTAL <br /> <br />$52,620.00 <br />$2,631.0.0 <br />$55,251.00 <br /> <br />Reviewed By: <br /> <br />c4#~ <br /> <br />Christopher Russo, City Manager <br /> <br />S '.B <br /> <br />P:\Proposals\2004 Proposals\04-4778 City of Sunny Isles Beach Margolis Park Underground Drainage.doc <br />