Laserfiche WebLink
<br /> <br />Florida Department of Transportation <br /> <br />JEB BUSH <br />GOVERNOR <br /> <br />605 Suwannee Street <br />Tallahassee, FL 32399-0450 <br /> <br />April 26, 2004 <br /> <br />JOSE ABREU <br />SECRETARY <br /> <br />Horsepower Electric, Inc. <br />8105 West 20 Avenue <br />Hialeah, FL 33014-3231 <br /> <br />Gentlemen: <br /> <br />RE: CERTIFICATE OF QUALIFICATION <br /> <br />The Department of Transportation has qualified your company f.or the amount <br />and the type of work'indicated below, Unless your company is notified <br />otherwise, this rating will expi~e June 30, 2005. <br /> <br />Please take notice that to ensure continuity in your certification at least <br />thirty (30) days must be allowed for the processing of your ~ application <br />for qualification, In accordance with 8.337.14 (1) F,S. your next application <br />must be filed within (4) months of the ending date of the applicant's audited <br />annual financial statements and, if applicable, the audited interim financial <br />statements, To remain qualified with the Department, a new application must <br />be submitted subsequent to any significant change in the financial position <br />or the structure of your firm as described in Section 14-22,005(3), Florida <br />Administrative Code. <br /> <br />.. <br />MAXIMUM CAPACITY RATING: $36,300,000.00 <br /> <br />WORK CLASS RATINGS: <br /> <br />1. Major Bridges: <br />a. Bridges which inClude Bascule Spans..,... .,..... .,'.... '.... "... '___ <br />b, Bridges which include Curved Steel Girders.. ,'.,. ',.,...".. ......___ <br />c. Bridges with Multi-Level Roadways, ..,...,... ,....,. .,....,.. ......___ <br />d. Bridges of Concrete Segmental Construction,....... .,..,..... .'....___ <br />e. Bridges which include Steel Truss Construction.... ,'... .,.,. .",.. <br />f, Bridges which include Cable Stayed Construction,... ......,.. ..,,'. <br />g, Bridges of conventional construction which are over a water <br />opening of 1000 feet or more..,. "!'" ..,..,.,..." ...."". ,.,... <br />2. Intermediate Bridges (Bridges that contain none of the type of <br />construction listed under Major Bridges and span lengths exceeding <br />50 feet (center to center of cap).,.,....,...........".",. . . . . , , . , , . . <br />3. Minor Bridges (Bridges with span lengths not exceeding 50 feet <br />(center to center or cap) and total length not exceeding 300 feet, <br />A Minor Bridge shall not contain any types of construction listed <br />under Major Bridges or Intermediate Bridges)... ....,. ...,..., .... ...... <br />4. Bascule Bridge Rehabilitation............ ..,.., '..,.... "... .'.,......, <br />5. Grading (Includes clearing and grUbbing, excavation, and embankment)... <br />6. Drainage (Includes all storm drains, pipe culverts, CUlverts, etc.).... <br />7. Flexible Paving (Includes 1imerock and shell base and other optional <br />base courses, soil-cemented based, mixed-in-place bituminous paving, <br />bit~minous s~rface treatments, and stabilizing) "..... ..... "..... .,. ,. <br />8, Portland Cement Concrete Paving,.,...... ,......... ......,.." .......... <br />9. Hot Plant-Mixed Bituminous Structural and Surface Courses... ...... ..... <br /> <br />www.dot.st8te.fl.us @ RECYCLEDPAPEA <br />