|
<br />
<br />Florida Department of Transportation
<br />
<br />JEB BUSH
<br />GOVERNOR
<br />
<br />605 Suwannee Street
<br />Tallahassee, FL 32399-0450
<br />
<br />April 26, 2004
<br />
<br />JOSE ABREU
<br />SECRETARY
<br />
<br />Horsepower Electric, Inc.
<br />8105 West 20 Avenue
<br />Hialeah, FL 33014-3231
<br />
<br />Gentlemen:
<br />
<br />RE: CERTIFICATE OF QUALIFICATION
<br />
<br />The Department of Transportation has qualified your company f.or the amount
<br />and the type of work'indicated below, Unless your company is notified
<br />otherwise, this rating will expi~e June 30, 2005.
<br />
<br />Please take notice that to ensure continuity in your certification at least
<br />thirty (30) days must be allowed for the processing of your ~ application
<br />for qualification, In accordance with 8.337.14 (1) F,S. your next application
<br />must be filed within (4) months of the ending date of the applicant's audited
<br />annual financial statements and, if applicable, the audited interim financial
<br />statements, To remain qualified with the Department, a new application must
<br />be submitted subsequent to any significant change in the financial position
<br />or the structure of your firm as described in Section 14-22,005(3), Florida
<br />Administrative Code.
<br />
<br />..
<br />MAXIMUM CAPACITY RATING: $36,300,000.00
<br />
<br />WORK CLASS RATINGS:
<br />
<br />1. Major Bridges:
<br />a. Bridges which inClude Bascule Spans..,... .,..... .,'.... '.... "... '___
<br />b, Bridges which include Curved Steel Girders.. ,'.,. ',.,...".. ......___
<br />c. Bridges with Multi-Level Roadways, ..,...,... ,....,. .,....,.. ......___
<br />d. Bridges of Concrete Segmental Construction,....... .,..,..... .'....___
<br />e. Bridges which include Steel Truss Construction.... ,'... .,.,. .",..
<br />f, Bridges which include Cable Stayed Construction,... ......,.. ..,,'.
<br />g, Bridges of conventional construction which are over a water
<br />opening of 1000 feet or more..,. "!'" ..,..,.,..." ...."". ,.,...
<br />2. Intermediate Bridges (Bridges that contain none of the type of
<br />construction listed under Major Bridges and span lengths exceeding
<br />50 feet (center to center of cap).,.,....,...........".",. . . . . , , . , , . .
<br />3. Minor Bridges (Bridges with span lengths not exceeding 50 feet
<br />(center to center or cap) and total length not exceeding 300 feet,
<br />A Minor Bridge shall not contain any types of construction listed
<br />under Major Bridges or Intermediate Bridges)... ....,. ...,..., .... ......
<br />4. Bascule Bridge Rehabilitation............ ..,.., '..,.... "... .'.,......,
<br />5. Grading (Includes clearing and grUbbing, excavation, and embankment)...
<br />6. Drainage (Includes all storm drains, pipe culverts, CUlverts, etc.)....
<br />7. Flexible Paving (Includes 1imerock and shell base and other optional
<br />base courses, soil-cemented based, mixed-in-place bituminous paving,
<br />bit~minous s~rface treatments, and stabilizing) "..... ..... "..... .,. ,.
<br />8, Portland Cement Concrete Paving,.,...... ,......... ......,.." ..........
<br />9. Hot Plant-Mixed Bituminous Structural and Surface Courses... ...... .....
<br />
<br />www.dot.st8te.fl.us @ RECYCLEDPAPEA
<br />
|