My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2004-749
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2004
>
Reso 2004-749
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 4:33:27 PM
Creation date
1/25/2006 1:57:47 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2004-749
Date (mm/dd/yyyy)
12/09/2004
Description
– $400,000 Grant from So. Fl. Water Mgmt District for Central Island Proj.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Task 1: Engineering Design and Permitting <br /> <br />· Prepare and submit to the District lOO% engineering plans <br />· Prepare and submit to the District construction costs estimates for the proposed work. <br />· Submit to the District proof of application for applicable permits. <br /> <br />Deliverables: Summary Report of engineering plans update including submittal of 100% engineering <br />plans and the information described in this task number 1. <br /> <br />Task 2: Preparation of Bid Documents and Specifications <br /> <br />· Prepare and submit to the District Bid Documents. <br />· Prepare and submit to the District specifications. <br />· Prepare and submit to the DISTRICT bid and contract award documents. <br /> <br />Delh'erables: Summary Report of bid documents and specifications update including submittal of the <br />information described in this task number 2. <br /> <br />Task 3: Construction, Construction Monitoring/Quarterly Reports <br /> <br />· Submit project summary with final engineer's cost estimate. <br />· Advertise Bid and conduct pre-bid meeting. <br />· Monitor the construction of the proj ect and submit progress reports and construction <br />invoices. <br />· Receive and open bids. <br />· Prepare bid tabulations and evaluate for successful bidder. <br />· Award Bid. <br />· Construct improvements as identified in 100% design plans, specifications and applicable permits. <br />· Prepare and submit to District construction schedule(s), quarterly construction progress reports, <br />quarterly pay requests, and quarterly updated construction project schedules. <br /> <br />peliverabJes: Submit to District work documents and information described in this task 3. <br /> <br />Task 4: Construction Certification <br /> <br />· Provide final certification and as-built drawings upon completion of construction. <br /> <br />Deliverables: Provide to the District final certification and as-built drawings upon completion of <br />construction. <br /> <br />Page 3, Exhibit "C", Statement of Work, OT05065S <br />
The URL can be used to link to this page
Your browser does not support the video tag.