My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-774
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-774
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 11:59:01 AM
Creation date
1/25/2006 1:57:50 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-774
Date (mm/dd/yyyy)
03/10/2005
Description
– Agmt w/FDF Designs Studio for Artwork at Samson Oceanfront Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />ARTWORK/PROJECT: Bronze sculpture with pedestal. Family grouping with sun birds. Bronze male figure <br />six (6) feet tall with female and children in proportion. Ten (10) to Fourteen (14) rods shall be attached to <br />the Sun. Pedestal base shall be four (4) feet wide and three (3) feet deep x five (5) feet high. The base will <br />be cement with granite tile. The overall height with sunrays shall be twelve feet and five (12.5) inches tall. <br />The Artist shall use the bronze alloy called "Evedur" silicon for the sculpture, <br /> <br />PURPOSE: ARTIST will design, fabricate and install an artwork/Project to commemorate the City's Art in <br />Public Places projects <br /> <br />LOCATION OF FACIUTY /SITE: Samson Oceanfront Park located on 174 Street in Collins Avenue. <br /> <br />ADMINISTRATIVE COORDINATION: The CONTRACT ADMINISTRATOR may designate a public art <br />project manager. The ARTIST shall maintain regular communication with the public art project manager via <br />phone, fax, letter or e-mail. <br /> <br />DESIGN COLLABORATION: During the design of the artwork, the ARTIST shall collaborate and coordinate <br />with the Contract Administrator and the CITY's designated Architect/Engineer, Construction Manager, and <br />General Contractor, respectively, at the Facility/Site, The design of the artwork shall be coordinated with the <br />Facility/Site design process in the following areas: aesthetics, public presentations, construction documents, <br />cost estimates and Facility project schedules. Should the design of the artwork require specialized <br />professional services, the ARTIST shall hire an appropriate sub-consultant and/or sub-contractor subject to <br />the prior written approval of the Contract Administrator. Upon approval of the artwork design, the ARTIST <br />shall create independently all necessary construction documents for the art and ancillary/support facilities <br />needed to install the art as required by the CITY and/or applicable laws and codes; or provide all necessary <br />information on a timely basis in the event that relevant components of the artwork design must be <br />incorporated into the final construction documents for the Facility, if appropriate. <br /> <br />CONSTRUCTION AND INSTALLATION COORDINATION: During the installation of the artwork, the <br />ARTIST shall collaborate and coordinate with the Contract Administrator. The ARTIST shall coordinate the <br />installation of the artworks with the Facility construction schedule and install the artwork in compliance with <br />the Facility construction documents. The ARTIST shall be responsible for construction oversight during the <br />fabrication and integration of all artist-designed components, whether fabricated by ARTIST's subcontractors <br />or included in construction documents to be fabricated and installed by others. <br /> <br />DELlVERABLES: the ARTIST shall provide the following deliverables: <br /> <br />I -A Research. <br /> <br />1. The ARTIST shall provide documentation of background research involving site specific <br />environmental and cultural elements, site documentation, and future users of the Facility. <br /> <br />2. The research phase includes two, two-day, site visits for meetings, including an initial <br />orientation visit, a coordination meeting with the design team, and community <br />representatives and partner agency presentation meeting(s). <br /> <br />I -B Design Development. The ARTIST shall complete the design development of the approved artwork <br />conceptual design and shall secure its approval from the CITY COMMISSION. Approval and notice to <br />proceed on fabrication shall occur after an architectural coordination review and submittal of all <br />artwork design development deliverables. Based on the requirements of the approved artwork <br />
The URL can be used to link to this page
Your browser does not support the video tag.