|
<br />and licenses, The CONTRACTOR will also pay all public utility charges.
<br />
<br />Electrical Power and Lighting:
<br />
<br />6, J 6 Electrical power required during construction shall be provided by each prime CONTRACTOR as required by
<br />them, This service shall be installed by a qualified electrical Contractor approved by the CITY. Lighting shall be
<br />provided by the CONTRACTOR in all spaces at all times where necessary for good and proper workmanship, for
<br />inspection or for safety, No temporary power shall be used off temporary lighting lines without specific approval of the
<br />CONTRACTOR.
<br />
<br />Laws and Regulations:
<br />
<br />6,17 The CONTRACTOR will give all notices and comply with all laws, ordinances, rules and regulations applicable
<br />to the Work. If the CONTRACTOR observes that the Specifications or Drawings are at variance therewith, they will
<br />give the CITY prompt written notice thereof, and any necessary changes shall be adjusted by an appropriate modification,
<br />If the CONTRACTOR performs any Work knowing it to be contrary to such laws, ordinances, rules and regulations, and
<br />without such notice to the CITY, they will bear all costs arising therefrom; however, it shall not be their primary
<br />responsibility to make certain that the Drawings and Specifications are in accordance with such laws, ordinances, rules
<br />and regulations,
<br />
<br />Taxes:
<br />
<br />6,18 Cost of all applicable sales consumer, use, and other taxes for which the CONTRACTOR is liable under the
<br />Contract shall be included in the Contract Price stated by the CONTRACTOR,
<br />
<br />Record Drawings:
<br />
<br />6,19 The CONTRACTOR will keep ODe record copy of all Specifications, Drawings, Addenda, Modifications and Shop
<br />Drawings at the site in good order and annotated to show all changes made during the construction process, These shall
<br />be available to any City Representative at all reasonable times and shall be delivered to the CITY upon completion of
<br />the Project.
<br />
<br />Safety and Protection:
<br />
<br />6,20 The CONTRACTOR will be responsible for initiating, maintaining and supervising all safety precautions and
<br />programs in connection with the Work. They will take all necessary precautions for the safety of, and will provide the
<br />necessary protection to prevent damage, injury or loss to:
<br />
<br />6.20, J All employees and other persons who may be affected thereby,
<br />
<br />6,20,2 All the Work and all materials or equipment to be incorporated therein, whether in storage on or off
<br />the site, and
<br />
<br />6,20,3 Other property at the site or adjacent thereto, including trees, shrubs, lawns, walks, pavements,
<br />roadways, structures and utilities not designated for removal, relocation or replacement in the course of
<br />construction,
<br />
<br />6,21 The CONTRACTOR will designate a responsible member of their organization at the site whose duty shall be the
<br />prevention of accidents, This person shall be the CONTRACTOR'S Superintendent unless otherwise designated in
<br />writing by the CONTRACTOR to the CITY,
<br />
<br />Emergencies:
<br />
<br />00710 - 11
<br />
<br />Cl I. 8'
<br />u ~ I.
<br />
|