<br />6,22 In emergencies affecting the safety of persons or the Work or property at the site or adjacent thereto, the
<br />CONTRACTOR, without special instruction or authorization from the CITY, is obligated to act, at their discretion, to
<br />prevent threatened damage, injury or loss, They will give the CITY prompt written notice of any significant changes
<br />in the Work or deviations from the Contract Documents caused thereby, If the CONTRACTOR believes that additional
<br />Work done by them in an emergency which arose from causes beyond their control entitles them to an increase in the
<br />Contract Price or an extension of the Contract Time, they may make a claim therefore as provided in articles 11 and 12,
<br />
<br />Shop Drawings and Samples:
<br />
<br />6,23 After checking and verifYing all field measurements, the CONTRACTOR will submit to the CITY for review, in
<br />accordance with the accepted schedule of shop drawing submissions six (6) copies of all Shop Drawings, which shall
<br />have been checked by and stamped with the approval of the CONTRACTOR and identified as the CONSULTANT
<br />may require, The data shown on the Shop Drawings will be complete with respect to dimensions, design criteria,
<br />materials of construction and the like to enable the CITY to review the infonnation as required.
<br />
<br />6,24 The CONTRACTOR will also submit to the CITY for review, with such promptness as to cause no delay in Work,
<br />all samples required by the Contract Documents,
<br />
<br />All samples will have been checked by and stamped with the approval of the CONTRACTOR, identified clearly as
<br />to material, manufacturer, any pertinent catalog numbers and the use for which intended,
<br />
<br />6.25 At the time of each submission, the CONTRACTOR will in writing call the CITY'S attention to any deviations
<br />that the Shop Drawings or sample may have from the requirements of the Contract Documents,
<br />
<br />6,26 The CITY will review with responsible promptness Shop Drawings and Samples, but their review shall be only
<br />for confonnance with the design concept of the Project and for compliance with the infonnation given in the Contract
<br />Documents, The review of a separate item as such will not indicate review of the assembly in which the items
<br />functions, The CONTRACTOR will make any corrections required by the CITY and will return the required number
<br />of corrected copies of Shop Drawings and resubmit new samples until the review is satisfactory to the CITY. The
<br />CONTRACTOR shall direct specific attention in writing or on resubmitted Shop Drawings to revisions other than the
<br />corrections called for by the CITY on previous submissions, The CONTRACTOR'S stamp of approval on any Shop
<br />Drawings or sample shall constitute representation to the CITY that the CONTRACTOR has either detennined and
<br />verified all quantities, dimension, field construction criteria, materials, catalog numbers and similar data or they assume
<br />full responsibility for doing so, and that they have reviewed or coordinated each Shop Drawing to sample with the
<br />requirements of the Work and the Contract Documents,
<br />
<br />6,27 No Work requiring a Shop Drawing or sample submission shall be commenced until the submission has been
<br />reviewed by the CITY. A copy of each Shop Drawing and each approved sample shall be kept in good order by the
<br />CONTRACTOR at the site and shall be available to the CITY,
<br />
<br />6,28 The CITY'S review of Shop Drawings or samples shall not relieve the CONTRACTOR from their responsibility
<br />for any deviations from the requirements of the Contract Documents unless the CONTRACTOR has in writing called
<br />the CITY'S attention to each deviation at the time of submission and the CITY has given written approval to the
<br />specific deviation, nor shall any review by the CITY relieve the CONTRACTOR from responsibility for errors or
<br />omission in the Shop Drawings,
<br />
<br />Cleaning up :
<br />
<br />6,29 The CONTRACTOR shall clean up behind the Work as much as is reasonably possible as the Work progresses,
<br />Upon completion of the Work, and before acceptance offmal payment for the Project by the CITY, the CONTRACTOR
<br />shall remove all their surplus and discarded materials, excavated material and rubbish from the roadways, sidewalks,
<br />parking areas, lawn and all adjacent property; shall clean their portion of Work involved in any building under this
<br />