My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2005-825
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2005
>
Reso 2005-825
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/17/2021 10:15:50 AM
Creation date
1/25/2006 1:57:58 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2005-825
Date (mm/dd/yyyy)
09/08/2005
Description
– Ratify Agmt w/Siltek Group Inc., Construction of 181st Drive Active Park.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />aubmiuals. Each Sample wUI be identified clearly as to <br />material, Supplier, pertinent data such as catalog numbers, <br />ad the use for which intended and otherwise as ENGINEER <br />may require to enable ENGINEER. to review the submittal <br />for the limited purposes required by paragraph 6.17 .E. The <br />numbers of each Sample to be submined will be as specified <br />in the SpecifICations. <br /> <br />C. Where a Shop Drawing or Sample is required by the <br />Contract Documents or the schedule of Shop Drawings and <br />Sample submittals acceptable to ENGINEER as required by <br />paragraph 2.07, any related Worle performed prior to <br />ENGINEER's review and approval of the peninent submittal <br />will be at the sole expeusc and responsibility of <br />CONTRACTOR. <br /> <br />D. SUbmittal Procedures <br /> <br />1. Before submitting each Sbop Drawiog or Sample, <br />CONTRACTOR shall have determined and verified: <br /> <br />a. all field measurements, quantities, dimen- <br />sions, specified performance criteria, installation <br />requirements, materials, catalog numbers, and <br />similar information with respect thereto; <br /> <br />b. all materials with respect to intended use, <br />fabrication, shipping, handling, storage, assembly, <br />and installation pertaining to the perfonnance of the <br />Work; <br /> <br />c. all information relative to means, methods, <br />techDiques, sequcoces, aad procedures of consUUC- <br />tion IUd safety precautions and programs iDcideut <br />tbcn:Co; IUd <br /> <br />cl. CONTRACTOR sbaIl also have reviewed <br />IUd COORIiDatecl cIdl Sbop DIawiDs or Sample with <br />other Shop Drawiap aDd Samples aDd with the <br />requirements of the Work and the Contract Docu- <br />ments. <br /> <br />2. Each submittal shaD bear a stamp or specific <br />wriuen indi~(inn that CONTRACTOR bas satisfied <br />CONTRACTOR's obligations under the Contract <br />~~ with respect to CONTRACTOR's review and <br />approval of that submiual. <br /> <br />3. At the time of each submiual, CONTRAcroR <br />sbal1 pw ENGINEER specific written DOCice of such <br />YUiadaas, If lIlY, dial chc Sbop:Drawiaa or Sample <br />submiJrecl may have from Ibe requiremeDts of Ibe <br />Conttact ~" such notice to be In a wriucn com- <br />IW"~ sepmre from the submittal; IUd, in .&fition, <br />shaI1 cause a specifIC: DOtatiOD to be made on each Shop <br /> <br />00700 - 24 <br /> <br />n <br /> <br />LJ <br /> <br />Drawing aad Sample submitted to ENGINEER for review <br />and approval of eacb such variation. <br /> <br />n <br /> <br />E. ENGINEER's Review <br /> <br />LJ <br /> <br />1. ENGINEER will timely review and approve <br />Sbop Drawings and Samples in accordance with the <br />schedule of Sbop Drawings and Sample submiaals <br />acceptable to ENGINEER. ENGINEER's review and <br />approval will be only to determine if lbe items covered by <br />the submittals will, after installation or incorporation in <br />the Work, conform to the information given in the <br />Contract Documents and be compatible with the design <br />concept of the completed Project as a fuoctioDiD& whole <br />as indicated by the Contract Documents. <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />2. ENGINEER's .review and approval will not <br />extend to means, methods, techniques, sequences, or <br />procedures 'or"construction (cm:pc where a particular <br />means, method, tec1mique, sequeace, or procedure of <br />c:onstruction is specifically and expressly called for by the <br />Contract I>ocumeDlS) or to safety prccautioas or programs <br />incident thereto. The review and approval of a separate <br />item as such will DOt iadicate approval of the assembly in <br />which the item functions. <br /> <br />LJ <br /> <br />n <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />3. ENGINEER's review and approval of Shop <br />Drawings or Samples sball nOl relieve CONTRACTOR <br />from responsibUity for any variation from the require- <br />ments of the Contract Documems UDless CONTRACTOR <br />bas in writing called ENGINEER's aaeotion to each such <br />variation al the time 'of each submiua1 81 required by <br />paragraph 6.17.D.3 IUd ENGINBBR bas Jiw:n wriaca <br />approvll of each such variaIioD by specific wriUea <br />notation Cbereof iDcoIporatecl ia. or accompaayiDg Ibe <br />Shop DrawiDg or Sample appruYIl; DOl' wiIllq' approval <br />by BNGINBBR. relieve CONTRACTOR .from <br />'responsibility. for:.c:omplyjug.:w.Id11he rcquiremI:DU of <br />paragraph 6.17.D.l. <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br />LJ <br /> <br />n <br />u <br /> <br />F. ResubmittaI Procedllres <br /> <br />1. CONlRACTOR sba11 make corrections ~ <br />by ENGINEER and shall rcturD Cbc required IlUIDber of <br />corrected copies of Shop Drawings aDd submit as <br />required aew Samples for ",view and approval. CON- <br />TRAcroR Ihall direct specifIC aacmioa ill writiDg to <br />revisioas ocher than die corrections called for by ENGI- <br />NEER OIl previous submittals. <br /> <br />6.18 Omtinulng 1M Wolt <br /> <br />A." CONTRACTOR shall em)' on die Work aod adhere <br />to cbc progress scbe&. duriD& all disputes or disqIeemeats <br />with OWNER. No Work shall be delayed or pos1pODe4 <br />~i"l resolution of lIlY disputes or disap'ecmeutl, except <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />u <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br /> <br />n <br /> <br />LJ <br />
The URL can be used to link to this page
Your browser does not support the video tag.